Orange County NC Website
DocuSign Envelope ID:070B6BC7-CDE2-4AO8-BE62-07FA6BFDO53B <br /> 11/20/2020 <br /> 3.8 CLEANOUT INSTALLATION <br /> A. Comply with requirements for cleanouts specified in Section 33 41 00 "Storm Utility Drainage <br /> Piping." <br /> B. Cleanouts for [Foundation] , [Retaining-Wall] , [and] [Landscaping] Subdrainage: <br /> 1. Install cleanouts from piping to grade. Locate cleanouts at beginning of piping run and at <br /> changes in direction. Install fittings so cleanouts open in direction of flow in piping. <br /> 2. Install cleanouts as shown in the Drawings and per manufacturer recommendations. <br /> 3.9 CONNECTIONS <br /> A. Comply with requirements for piping specified in Section 33 41 00 "Storm Utility Drainage <br /> Piping."Drawings indicate general arrangement of piping, fittings, and specialties. <br /> 3.10 FIELD QUALITY CONTROL <br /> A. Tests and Inspections: <br /> 1. After installing drainage course to top of piping,test drain piping with water to ensure free <br /> flow before backfilling. <br /> 2. Remove obstructions, replace damaged components, and repeat test until results are <br /> satisfactory. <br /> B. Drain piping will be considered defective if it does not pass tests and inspections. <br /> C. Prepare test and inspection reports. <br /> 3.11 CLEANING <br /> A. Clear interior of installed piping and structures of dirt and other superfluous material as work <br /> progresses.Maintain swab or drag in piping and pull past each joint as it is completed.Place plugs <br /> in ends of uncompleted pipe at end of each day or when work stops. <br /> END OF SECTION 33 46 00 <br /> 33 46 00 SUBDRAINAGE Page 4 of 4 <br />