Browse
Search
2021-016-E AMS-ASJ Wilson Construction LLC BOE site improvements
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2020's
>
2021
>
2021-016-E AMS-ASJ Wilson Construction LLC BOE site improvements
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/9/2021 11:59:34 AM
Creation date
2/9/2021 11:33:54 AM
Metadata
Fields
Template:
Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
88
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DocuSign Envelope ID:070B6BC7-CDE2-4AO8-BE62-07FA6BFDO53B <br /> 11/20/2020 <br /> I. Cleanout rim elevations shall be placed at the bottom of the decorative stone elevations, unless <br /> otherwise shown in the Drawings. <br /> 3.4 FIELD QUALITY CONTROL <br /> A. Inspect interior of piping to determine whether line displacement or other damage has occurred. <br /> Inspect after approximately 24 inchesof backfill is in place, and again at completion of Project. <br /> 1. Submit separate reports for each system inspection. <br /> 2. Defects requiring correction include the following: <br /> a. Alignment: Less than full diameter of inside of pipe is visible between structures. <br /> b. Deflection: Flexible piping with deflection that prevents passage of ball or cylinder <br /> of size not less than 92.5 percent of piping diameter. <br /> C. Damage: Crushed,broken, cracked, or otherwise damaged piping. <br /> d. Infiltration: Water leakage into piping. <br /> e. Exfiltration: Water leakage from or around piping. <br /> 3. Replace defective piping using new materials, and repeat inspections until defects are <br /> within allowances specified. <br /> 4. Reinspect and repeat procedure until results are satisfactory. <br /> B. Test new piping systems, and parts of existing systems that have been altered, extended, or <br /> repaired, for leaks and defects. <br /> 1. Do not enclose,cover, or put into service before inspection and approval. <br /> 2. Test completed piping systems according to requirements of authorities having <br /> jurisdiction. <br /> 3. Schedule tests and inspections by authorities having jurisdiction with at least 48 hours' <br /> advance notice. <br /> 4. Submit separate report for each test. <br /> C. Leaks and loss in test pressure constitute defects that must be repaired. <br /> D. Replace leaking piping using new materials, and repeat testing until leakage is within allowances <br /> specified. <br /> 3.5 CLEANING <br /> A. Clean interior of piping of dirt and superfluous materials. Flush with water. <br /> END OF SECTION 33 4100 <br /> 3341 00 STORM UTILITY DRAINAGE Page 3 of 3 <br /> PIPING <br />
The URL can be used to link to this page
Your browser does not support the video tag.