Browse
Search
2021-016-E AMS-ASJ Wilson Construction LLC BOE site improvements
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2020's
>
2021
>
2021-016-E AMS-ASJ Wilson Construction LLC BOE site improvements
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/9/2021 11:59:34 AM
Creation date
2/9/2021 11:33:54 AM
Metadata
Fields
Template:
Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
88
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DocuSign Envelope ID:070B6BC7-CDE2-4AO8-BE62-07FA6BFDO53B <br /> 11/20/2020 <br /> SECTION 33 41 00- STORM UTILITY DRAINAGE PIPING <br /> PART 1 -GENERAL <br /> 1.1 RELATED DOCUMENTS <br /> A. Drawings and general provisions of the Contract, including General and Supplementary <br /> Conditions and Division 01 Specification Sections,apply to this Section.All utilities incorporated <br /> in the project shall be provided, installed and tested in accordance with Local Municipal <br /> Regulations <br /> B. NCDOT Standards and Specifications for work inside public right-of-way. <br /> C. Local Municipal standards and specifications for work on site. <br /> 1.2 DELIVERY, STORAGE,AND HANDLING <br /> A. Do not store plastic manholes,pipe,and fittings in direct sunlight. <br /> B. Protect pipe,pipe fittings, and seals from dirt and damage. <br /> C. Handle manholes according to manufacturer's written rigging instructions. <br /> D. Handle catch basins, stormwater inlets and stormwater riser structures according to <br /> manufacturer's written rigging instructions. <br /> 1.3 PROJECT CONDITIONS <br /> A. Interruption of Existing Storm Drainage Service: Do not interrupt service to facilities occupied <br /> by Owner or others unless permitted under the following conditions and then only after arranging <br /> to provide temporary service according to requirements indicated: <br /> 1. Notify Construction Manager no fewer than 7 calendar days days in advance of proposed <br /> interruption of service. <br /> 2. Do not proceed with interruption of service without Construction Manager's written <br /> permission. <br /> PART 2 -PRODUCTS <br /> PART 3 -EXECUTION <br /> 3.1 EARTHWORK <br /> A. Excavation,trenching, and backfilling are specified in Section 3120 00 "Earth Moving." <br /> 3341 00 STORM UTILITY DRAINAGE Page 1 of 3 <br /> PIPING <br />
The URL can be used to link to this page
Your browser does not support the video tag.