Browse
Search
2021-016-E AMS-ASJ Wilson Construction LLC BOE site improvements
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2020's
>
2021
>
2021-016-E AMS-ASJ Wilson Construction LLC BOE site improvements
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/9/2021 11:59:34 AM
Creation date
2/9/2021 11:33:54 AM
Metadata
Fields
Template:
Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
88
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DocuSign Envelope ID:070B6BC7-CDE2-4AO8-BE62-07FA6BFDO53B <br /> 11/20/2020 <br /> SECTION 32 13 13 - CONCRETE PAVING <br /> PART 1 -GENERAL <br /> 1.1 RELATED DOCUMENTS <br /> A. Drawings and general provisions of the Contract, including General and Supplementary <br /> Conditions and Division 01 Specification Sections,apply to this Section. <br /> 1.2 SUMMARY <br /> A. Section Includes Concrete Paving Including the Following: <br /> 1. Walks. <br /> B. Related Requirements: <br /> 1. Section 03 30 00 "Cast-in-Place Concrete" for general building applications of concrete. <br /> 2. Section 32 13 73 "Concrete Paving Joint Sealants" for joint sealants in expansion and <br /> contraction joints within concrete paving and in joints between concrete paving and asphalt <br /> paving or adjacent construction. <br /> 1.3 DEFINITIONS <br /> A. Cementitious Materials: Portland cement alone or in combination with one or more of blended <br /> hydraulic cement, fly ash, slag cement, and other pozzolans. <br /> B. W/C Ratio: The ratio by weight of water to cementitious materials. <br /> 1.4 PREINSTALLATION MEETINGS <br /> A. Preinstallation Conference: Conduct conference at Project site. <br /> 1. Review methods and procedures related to concrete paving, including but not limited to, <br /> the following: <br /> a. Concrete mixture design. <br /> b. Quality control of concrete materials and concrete paving construction practices. <br /> 2. Require representatives of each entity directly concerned with concrete paving to attend, <br /> including the following: <br /> a. Contractor's superintendent. <br /> b. Independent testing agency responsible for concrete design mixtures. <br /> C. Concrete paving Subcontractor. <br /> 32 13 13 CONCRETE PAVING Page 1 of 11 <br />
The URL can be used to link to this page
Your browser does not support the video tag.