Browse
Search
2021-016-E AMS-ASJ Wilson Construction LLC BOE site improvements
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2020's
>
2021
>
2021-016-E AMS-ASJ Wilson Construction LLC BOE site improvements
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/9/2021 11:59:34 AM
Creation date
2/9/2021 11:33:54 AM
Metadata
Fields
Template:
Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
88
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DocuSign Envelope ID:070B6BC7-CDE2-4AO8-BE62-07FA6BFDO53B <br /> 11/20/2020 <br /> 3.2 SITE IMPROVEMENTS <br /> A. Remove existing above- and below-grade improvements as indicated and necessary to facilitate <br /> repairs. <br /> B. Remove slabs,paving,curbs, gutters, and aggregate base as indicated. <br /> 1. Unless existing full-depth joints coincide with line of demolition,neatly saw-cut along line <br /> of existing pavement to remain before removing adjacent existing pavement. Saw-cut faces <br /> vertically. <br /> 2. Paint cut ends of steel reinforcement in concrete to remain with two coats of antirust <br /> coating,following coating manufacturer's written instructions.Keep paint off surfaces that <br /> will remain exposed. <br /> 3.3 DISPOSAL OF SURPLUS AND WASTE MATERIALS <br /> A. Remove surplus soil material, unsuitable topsoil, obstructions, demolished materials, and waste <br /> materials including trash and debris,and legally dispose of them off Owner's property in a timely <br /> manner. <br /> B. Separate recyclable materials produced during site clearing from other nonrecyclable materials. <br /> Store or stockpile without intermixing with other materials and transport them to recycling <br /> facilities. Do not interfere with other Project work. <br /> END OF SECTION 31 10 00 <br /> 31 1000 SITE WORK Page 3 of 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.