Orange County NC Website
DocuSign Envelope ID:070B6BC7-CDE2-4AO8-BE62-07FA6BFDO53B <br /> Item#5 —Fiber Optics Line <br /> There is a fiber optics line coming from the north end of the building that will be marked prior to <br /> construction. Utmost care must be taken while working around these lines. <br /> Item#6— Schedule <br /> The Board of Elections will NOT have a Spring primary, so there will not be any work restrictions <br /> on the outside of the building. However, the existing handicap ramp needs to remain in place as <br /> long as practical. <br /> Item#7 —Bid Bond <br /> A bid bond is needed on the project for this informal bid. <br /> Item#8 —Paver Sidewalk <br /> The question was what type of bedding is needed for the brick. The detail calls out for 1 %" <br /> setting bed material which is a concrete sand. There are railings on the porch on the right side, <br /> they are to be removed. On the left side where the access ramp is removed no railing system is <br /> required. The edge of the entry where the ramp is removed shall be finished with a brick edge. <br /> End of Addendum#1 <br />