Browse
Search
2021-016-E AMS-ASJ Wilson Construction LLC BOE site improvements
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2020's
>
2021
>
2021-016-E AMS-ASJ Wilson Construction LLC BOE site improvements
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/9/2021 11:59:34 AM
Creation date
2/9/2021 11:33:54 AM
Metadata
Fields
Template:
Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
88
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DocuSign Envelope ID:070B6BC7-CDE2-4AO8-BE62-07FA6BFDO53B <br /> Document A310 TIVI - 2010 <br /> Bid Bond 901-BB <br /> CONTRACTOR: SURETY: <br /> (Name, legal status and address) (Name, legal status and principal place <br /> ASJ Wilson Construction,LLC of business) <br /> ADDITIONS AND DELETIONS: <br /> 415 Pisgah Church Road,PMB 128 RLI Insurance Company The author of this document has <br /> Greensboro,NC 27455-2590 9025 N.Lindbergh Drive added information needed for its <br /> Peoria, IL 61615-1431 completion.The author may also <br /> have revised the text of the original <br /> OWNER: AIA standard form.An Additions and <br /> (Name, legal status and address) Deletions Report that notes added <br /> information as well as revisions to the <br /> Orange County Government standard form text is available from <br /> 200 South Cameron St. <br /> Hillsborough,NC 27278 the author and should be reviewed.A <br /> vertical line in the left margin of this <br /> document indicates where the author <br /> BOND AMOUNT: has added necessary information <br /> 5%of Maximum Amount Bid and where the author has added to or <br /> deleted from the original AIA text. <br /> This document has important legal <br /> PROJECT: consequences.Consultation with an <br /> (Name, location or address, and Project number, if arty) attorney is encouraged with respect <br /> Orange County Bond No.367-005302:Orange County Board of Elections Site to its completion or modification. <br /> Improvements at Hillsborough,NC Any singular reference to Contractor, <br /> Surety,Owner or other party shall be <br /> considered plural where applicable. <br /> The Contractor and Surety are bound to the Owner in the amount set forth above,for the <br /> payment of which the Contractor and Surety bind themselves,their heirs,executors, <br /> administrators,successors and assigns,jointly and severally,as provided herein.The <br /> conditions of this Bond are such that if the Owner accepts the bid of the Contractor within <br /> the time specified in the bid documents,or within such time period as may be agreed to by <br /> the Owner and Contractor,and the Contractor either(I)enters into a contract with the <br /> Owner in accordance with the terms of such bid,and gives such bond or bonds as may be <br /> specified in the bidding or Contract Documents,with a surety admitted in the jurisdiction <br /> of the Project and otherwise acceptable to the Owner, for the faithful performance of such <br /> Contract and for the prompt payment of labor and material furnished in the prosecution <br /> thereof or(2)pays to the Owner the difference,not to exceed the amount of this Bond, <br /> between the amount specified in said bid and such larger amount for which the Owner may <br /> in good faith contract with another party to perform the work covered by said bid,then <br /> this obligation shall be null and void,otherwise to remain in full force and effect.The <br /> Surety hereby waives any notice of an agreement between the Owner and Contractor to <br /> extend the time in which the Owner may accept the bid.Waiver of notice by the Surety <br /> shall not apply to any extension exceeding sixty(60)days in the aggregate beyond the time <br /> for acceptance of bids specified in the bid documents,and the Owner and Contractor shall <br /> obtain the Surety's consent for an extension beyond sixty(60)days. <br /> AIA Document A31 OT —2010.Copyright Q 1983,1970 and 2010 byThe American Insbtute of Architects.All rights reserved.WARN ING:This Al A Document <br /> is protected by U.S.copyright Law and International Treaties.Unauthorized reproduction or distribution of this AIA' Document,or any portion of it, <br /> may result in severe civil and criminal ponaltles,and will be prosecuted to the maximum extent possible under the law. <br /> 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.