Browse
Search
2021-016-E AMS-ASJ Wilson Construction LLC BOE site improvements
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2020's
>
2021
>
2021-016-E AMS-ASJ Wilson Construction LLC BOE site improvements
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/9/2021 11:59:34 AM
Creation date
2/9/2021 11:33:54 AM
Metadata
Fields
Template:
Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
88
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DocuSign Envelope ID:070B6BC7-CDE2-4AO8-BE62-07FA6BFDO53B <br /> [Departmental Use Only] <br /> TITLE Bid No 367-005302: Board of <br /> Elections Storm water improvements <br /> FY 2020-2021 <br /> NORTH CAROLINA <br /> CONSTRUCTION AGREEMENT UNDER $250,000.00 <br /> ORANGE COUNTY <br /> THIS CONSTRUCTION AGREEMENT (hereinafter called "Agreement"), made as of the 18th <br /> day of January, 2021, by and between ASJ Wilson Construction, LLC, (hereinafter called the <br /> "Contractor"), and Orange County, a political subdivision of the State of North Carolina, (hereinafter <br /> called the "County," "Orange County," or"Owner"). <br /> WITNESSETH: <br /> That the Contractor and the Owner, for the consideration herein named, agree as follows: <br /> 1. CONTRACT DOCUMENTS; PRIORITY <br /> The Contract Documents consist of this Agreement, the Request for Proposals, Proposal, <br /> Construction Drawings, and Written Specifications. The Contract Documents form the Contract. In the <br /> event of any inconsistency between or among the Contract Documents the Contract Documents shall be <br /> interpreted in the following order of priority: <br /> a. This Agreement. <br /> b. Designer Approved Bulletins and Field Orders. <br /> c. Request for Proposals and addenda thereto. <br /> d. Proposal. <br /> 2. SCOPE OF WORK <br /> The Contractor shall furnish and deliver all of the materials, and perform all of the work <br /> required by this Agreement within the time period stipulated in a written Notice-to-Proceed to be <br /> executed by the Contractor and Owner and in accordance with the following enumerated documents, <br /> which are made a part hereof as if fully contained herein: <br /> a. Construction Drawings prepared by Summit Design and Engineering Services (Sheet C-1, <br /> C-2, C-3, D-1, D-2 dated September 4, 2020, and Addendum#1 dated December 18, 2020) <br /> b. Written specifications prepared by the project engineer. <br /> c. ASJ Wilson Construction, LLC proposal dated December 29, 2020 which fully describes <br /> the work to be performed. Such work will hereafter be called the "Work". <br /> d. Related documents listed under Section 1 above. <br /> Revised 07/20 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.