Orange County NC Website
DocuSign Envelope ID:B87D26F4-8DFD-42F4-9EA6-1D3CBD6749F3 <br /> SIEMENS <br /> 411r,114i�r-for-Life <br /> Scope of Work <br /> Siemens will provide the following: <br /> General Proiect Scope: <br /> - Provide Project management and technical labor for coordination, material sizing and procurement, <br /> programming and graphics as needed, testing and check-out <br /> - Provide before and after particle count readings on each floor and outside <br /> - Engineered As-Built panel lay-out drawings as required <br /> - One year warranty on material and labor. <br /> Seymour Center Great Hall <br /> 1. Provide and install fan mounted 02 Prime Needle Point Bipolar Technology for (3) Samsung Split Systems <br /> located in the mezzanine of the Great Hall. <br /> 2. Tie-in dry contact from each unit to Siemens system to monitor operational readiness of unit. Provide <br /> expansion module at existing PXC controller as needed. <br /> Exclusions & Clarifications <br /> 1. All work conducted during normal working hours, from Sam to 5pm Monday through Friday. We will have <br /> to temporarily shut down AHU operation for safe installation. If Orange County prefers to perform the work <br /> after normal working hours, an option for Afterhours/Weekend work can be provided. <br /> 2. All power will be pulled from local power source. <br /> 3. Due to COVID-19 impacts, to this work is subject to potential labor and material delays which are out of <br /> our control. <br /> 4. Pricing subject to change after 30 days. <br /> Page 6 of 10 <br />