Browse
Search
2021-027-E AMS-Siemens Industries Seymour ionization
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2020's
>
2021
>
2021-027-E AMS-Siemens Industries Seymour ionization
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/8/2021 2:19:50 PM
Creation date
2/8/2021 10:16:49 AM
Metadata
Fields
Template:
Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
23
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DocuSign Envelope ID: B87D26F4-8DFD-42F4-9EA6-1D3CBD6749F3 <br /> [Departmental Use Only] <br /> TITLE Seymour Ionization <br /> FY 2020-2021 <br /> NORTH CAROLINA <br /> CONSTRUCTION AGREEMENT UNDER$250,000.00 <br /> ORANGE COUNTY <br /> THIS CONSTRUCTION AGREEMENT (hereinafter called "Agreement"), made as of the 21 st <br /> day of January, 2021, by and between Siemens Industry, Inc, (hereinafter called the "Contractor"), and <br /> Orange County, a political subdivision of the State of North Carolina, (hereinafter called the "County," <br /> "Orange County," or"Owner"). <br /> WITNESSETH: <br /> That the Contractor and the Owner, for the consideration herein named, agree as follows: <br /> 1. CONTRACT DOCUMENTS; PRIORITY <br /> The Contract Documents consist of this Agreement, the Request for Proposals, Proposal, <br /> Construction Drawings, and Written Specifications. The Contract Documents form the Contract. In the <br /> event of any inconsistency between or among the Contract Documents the Contract Documents shall be <br /> interpreted in the following order of priority: <br /> a. This Agreement. <br /> b. Designer Approved Bulletins and Field Orders. <br /> c. Request for Proposals and addenda thereto. <br /> d. Proposal. <br /> 2. SCOPE OF WORK <br /> The Contractor shall furnish and deliver all of the materials, and perform all of the work <br /> required by this Agreement within the time period stipulated in a written Notice-to-Proceed to be <br /> executed by the Contractor and Owner and in accordance with the following enumerated documents, <br /> which are made a part hereof as if fully contained herein: <br /> a. Construction Drawings prepared by N/A (Sheet dated ) <br /> b. Written specifications prepared by the project engineer. <br /> c. Siemens Industry, Inc proposal dated December 20, 2020 which fully describes the work <br /> to be performed. Such work will hereafter be called the "Work". <br /> d. Related documents listed under Section 1 above. <br /> 3. TERM AND SCHEDULING <br /> Revised 07/20 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.