Browse
Search
2021-022-E AMS-Hoffman Mechanical Solutions, Inc. BOE Daiken service agreement
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2020's
>
2021
>
2021-022-E AMS-Hoffman Mechanical Solutions, Inc. BOE Daiken service agreement
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/8/2021 2:12:44 PM
Creation date
2/5/2021 1:50:33 PM
Metadata
Fields
Template:
Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DocuSign Envelope ID:A91745B2-0048-49DC-B6BF-676F03362AEA <br /> H V <br /> HOFFMAN <br /> MECHANICAL SOLUTIONS <br /> Equipment List <br /> The following"Covered Equipment" will be serviced at: <br /> Orange County Board of Elections <br /> Quantity Manuacturer Model No. Notes <br /> 1 Daikin REYQ120TATJU HR Outdoor Unit <br /> 1 Daikin REYQ72TATJU HR Outdoor Unit <br /> 1 Daikin RXYQ96TTJU HP Outdoor Unit <br /> 2 Daikin BSIOQ54TVJ Multi-port Branch Selector <br /> 1 Daikin BS8Q54TV1 Multi-port Branch Selector <br /> 19 Daikin FXZQ07TAVJU Fan Coil <br /> 5 Daikin FXZQ12TAVJU Fan Coil <br /> 2 Daikin FXMQ30PBVJU Fan Coil <br /> 1 Daikin FXMQ96MFVJU Outdoor Air Processor <br /> All Associated Daikin Central and Zone Controls <br /> Inspection Schedule: <br /> Description Jan Feb Mar Apr May June July. Aug Sept Oct Nov Dec <br /> VRV Cooling Performance Evaluation X <br /> VRV Heating Performance Evaluation X <br /> VRV Outdoor Unit Coil Cleaning X <br /> Base Daikin VRV/VRF preventative maintenance service agreement: <br /> • Outdoor Units. <br /> o Investigate alarms. <br /> o Verify proper power supply. <br /> o Visually inspect electrical connections. <br /> o Visually inspect for signs of refrigerant leaks. <br /> o Visually inspect coil cleanliness. <br /> o Verify temperature and pressure sensor calibration. <br /> o Verify coil temperature control processes. <br /> o Verify proper refrigerant level. <br /> o Verify proper DIII communications. <br /> o Record operating data. <br /> • Indoor Units. <br /> o Investigate alarms. <br /> o Verify sensor calibration. <br /> o Verify fan operation. <br /> o Confirm start/stop command operation. <br /> o Verify indoor unit response to temperature setpoint changes. <br /> o Verify proper EEV control. <br /> o Verify proper Branch Selector box mode control. <br /> o Backup iTouch Manager/Controller database. (If equipped.) <br /> Page 5 of 8 <br />
The URL can be used to link to this page
Your browser does not support the video tag.