Orange County NC Website
DocuSign Envelope ID:B8401 D1 C-A30A-44C6-BC09-2113E484804E <br /> Includes Installation <br /> 6.1 1/8"ADA 2 Ply-Base plus Applique- <br /> 6.2 Acrylic Clear-1/8"-3MM-.118"- <br /> 6.3 Installation-1 Person,Standard(no bucket truck)- <br /> 7 Install Trip Charge 2 $56.70 $113.40 <br /> 7.1 Trip Charge-In State(By Mile)- <br /> 8 Setup&Design Fee, Pre-Press,Admin,30 min free basic 1 $29.95 $29.95 <br /> design <br /> Setup Fee-Setup fees include file pre-press preparation,RIP conversion, Product Discount Applied:(59.84%) $44.63 <br /> 8.1 and associated operational costs <br /> Graphic/Layout Design-30 minutes of design including a maximum of 3 <br /> 8.2 changes are provided free of charge. Additional design and changes <br /> billed at an hourly rate of$85 per hour in half hour increments. <br /> Subtotal: $4,382.48 <br /> TURNAROUND TIMES: Taxes: $328.69 <br /> Standard turnaround time for quick turn signage orders is 5-7 business days. Grand Total: $4,711.17 <br /> Custom fabricated signs require a longer production cycle and may take as long <br /> as 4 to 6 weeks or longer depending on the complexity,the quantity of signs <br /> ordered,and the scope of the project. If your sign requires permitting,we do not <br /> begin fabrication until we have an approved permit from your town's planning <br /> department. <br /> Rush fees are available on quick turn signage made in our main store fabrication <br /> department to expedite an order upon request. Please ask your sales <br /> representative for details. <br /> The above-mentioned prices specifications and conditions are satisfactory and are hereby accepted. <br /> You are authorized to do all the work specified. Payment will be made as outlined above <br /> Signature: Date: <br /> Choose Design Element for quick turn signs to multi phase developments, digital pylon signs,entry monuments, and more! <br /> Generated On:12/22/2020 3:12 PM Page 3 of 3 <br />