Orange County NC Website
33 <br /> PROCESS: "' <br /> • Schedule,and Action: <br /> First Action — Planning staff schedules a <br /> Neighborhood Information Meeting(NIM). <br /> — DONE.Meeting held on-line on September 15,2020. <br /> Second Action — The Planning Board reviews the <br /> application at a regular meeting and makes a <br /> recommendation to the BOCC. <br /> — Done. Meeting held on-line on November 4,2020. <br /> Third Action — The BOCC receives the Planning <br /> Board recommendation and makes a decision at a <br /> previously advertised public hearing. <br /> — Occurring <br /> ORANGE COUNTY <br /> FUTURE DEVELOPMENT: 14 <br /> • Development shall only be permitted through the <br /> review and approval of site plan application(s) in <br /> accordance within Section 2.5 of the UDO. <br /> — No additional Board review(i.e. Planning Board/ <br /> BOCC)shall be required. <br /> STAFF COMMENT. No Board review (i.e. <br /> Planning Board/BOCC)required for identified <br /> 'permitted' land under current zoning (i.e. <br /> permitted uses listed in Section 5.2 of the <br /> UDO). Most of the proposed land uses could be <br /> developed under existing zoning without additional <br /> public comment(i.e.manufacturing,restaurant,hotel, <br /> offices) ouNc o Nrr <br /> Beth Trahos, Lawyer with Nelson Mullins, made the following PowerPoint presentation <br /> (Stan Beard, and Jason Harris of Buc-ee's; and Kelsey Westwood and Earl Lewellyn of Kimley <br /> Horn also present): <br /> Efland Station <br /> Existing Base Zoning:O/RM <br /> Proposed Base Zoning:MPS-C2 <br /> nNELSON <br /> MULLINS <br />