Orange County NC Website
26 <br /> The FLUM can be accessed utilizing the following link: <br /> http://www.orangecountync.gov/DocumentCenterNiew/4054/Future-Land-Use-Map- <br /> PDF. <br /> • Comprehensive Plan: Per Appendix F, "Relationships Between Land Use Categories and <br /> Zoning Districts Matrix"of the adopted Orange County Comprehensive Plan, the MPD-CZ <br /> district is a permissible zoning designation for property located within a CITAN. <br /> For more information on the definition of activity node, and to review the allowed zoning <br /> designations permitted within same, the Comprehensive Plan can be accessed utilizing <br /> the following link: <br /> http://www.orangecountVnc.gov/1242/2030-Comprehensive-Plan. <br /> • Growth Management System Map Designation: As previously indicated herein, both <br /> parcels within an `Urban' designated area. <br /> STAFF COMMENT: The Growth Management System Map is a tool utilized by <br /> staff to identify permit review thresholds for residential (i.e. subdivision) projects. <br /> • Water and Sewer Management, Planning and Boundary Agreement (WASMPBA): The <br /> parcels are located within Orange County's Primary Service Area meaning public utilities <br /> (i.e. water and sewer) could be extended. As detailed above, public utility service would <br /> be provided by the Orange-Alamance Water System (OAWS) and the City of Mebane. <br /> The document can be accessed utilizing the following link: <br /> http://www.orangecountync.gov/DocumentCenterNiew/4190/Water-and-Sewer- <br /> Management-Planning-and-Boundary-Agreement-PDF. <br /> • Efland-Mebane Small Area Plan: The parcels are located within an area the small area <br /> plan designates as supporting high-intensity/urban style development including non- <br /> residential development(s). <br /> The adopted plan can be accessed utilizing the following link: <br /> https://www.orangecountync.gov/DocumentCenter/View/4196/Efland-Mebane-Small- <br /> Area-Plan-PDF. <br /> Analysis: As required under Section 2.9.2 (E) of the LIDO, the Planning Director is required to: <br /> `... cause an analysis to be made of the application'and pass that analysis on to the reviewing <br /> body. In analyzing this request, the Planning Director offers the following: <br /> 1. The application is complete in accordance with the requirements of Section 2.9.2 (C) of <br /> the UDO; <br /> 2. The proposal appears consistent with the various goals outlined within the Comprehensive <br /> Plan concerning development, including: <br /> a. Land Use Overarching Goal: Coordination of the amount, location, pattern, and <br /> designation of future land uses, with availability of County services and facilities <br /> sufficient to meet the needs of Orange County's population and economy <br /> consistent with other Comprehensive Plan element goals and objectives. <br /> b. Land Use Goal 2: Land uses that are appropriate to on-site environmental <br /> conditions and features and that protect natural resources, cultural resources, and <br /> community character. <br />