Orange County NC Website
Document management portal powered by Laserfiche WebLink 9 © 1998-2015 Laserfiche. All rights reserved.
24 <br /> Staff does recommend allowing for an access easement which would <br /> allow residents from the Home Park to access the Project and, more <br /> importantly, the development area intended to support regional transit <br /> needs. <br /> o Eastern Property line (US Highway 70/1-85 Connector Road): <br /> ■ 40 ft. land use buffer and setback. <br /> STAFF COMMENT: Staff does not have a concern with this proposal <br /> relating to the US Highway 70/1-85 Connector Road right-of-way. <br /> AGRICULTURAL/ <br /> RESIDENTIAL USE \ <br /> DEVELOPMENT <br /> AREA 6 30'C-'-RHEAO <br /> ENHANCED \ UTILITY EASEMENT <br /> W TYPE D BUFFER <br /> (MIXED OPTION) <br /> STORMWATER <br /> W TYPE C BUFFER ��� MANAGEMENT FACILITY <br /> (OVERHEAD UTILITY OPTION) ` <br /> 0 \ <br /> 20'TYPE A BUFFER p i ,• <br /> (MIXED OPTION) <br /> ES—ER VCD GRCCN <br /> SPACE AREA <br /> DEVELOPMENT \ <br /> J AREA 3 0 <br /> W WETUWD BUFFER <br /> ,EASEMENT .:.'• i �� <br /> W TYPE A BUFFER DEVELOPMENT // h <br /> (MIXED OPTION) AREA 2 / \� CO AGRICULTURAL/ <br /> ^--•` 1 J' RESIDENTIAL USE <br /> 1 40'TYPE C BUFFER <br /> MIXED OPTION', <br /> STAFF COMMENT: Per Section 6.8.12 (C) of the UDO, land use buffers are based on <br /> proposed development as well as existing land use(s) on the adjacent parcel. Further, <br />