Orange County NC Website
22 <br /> STAFF COMMENT: Staff has recommended a 50 ft. land use buffer <br /> and only allowing for vehicular access (i.e. travel lanes) within 75 ft. of <br /> the northern property line. This effectively would impose a 75 ft. <br /> setback for all structures. <br /> The applicant has indicated they are amenable to a 50 ft. land use <br /> buffer. <br /> The applicant has offered, as a condition, to erect a 6 ft. wall outside of <br /> the buffer creating additional shielding of the Project along the northern <br /> property line as well. <br /> o Western property line (Mt. Willing Road): <br /> ■ 40 ft. land use buffer and setback; <br /> STAFF COMMENT: Staff has recommended a 50 ft. buffer and <br /> setback. <br /> NORTH CARUL.IIVH rv• .' - <br /> R1 RESIDENTIAL USE <br /> I I 6'FENCE ON INTERIOR <br /> 20'TYPE A BUFFER <br /> DEVELOPMENTI OF MY BUFFER ` — - <br /> - <br /> (MIXED OPTION)- i I AREA 5 q0'TYPED FF ENKANC <br /> ER 30'UTILITY EASEMENT /r- <br /> (MIXED OPTIONI f Il DEVELOPMENT <br /> AREA 5 <br /> ( 'C• — — — �YO'TYPEABI.F=ER I. <br /> RI RESIDENTIAL USE 81'UTILITYEASEMENT (MIXrDO'TION) T <br /> v <br /> 40'TYPE G BUFFER <br /> (OVERFIEAD UTILITY OPTION) <br /> 25'FUTURE ROADWAY <br /> IMPROVEMENT RESERVATION _ - PRLS <br /> - - - DEVELOPMENT AREA 4 SF <br /> 64'UTILITY EASEMENT PRESERVED GREEN <br /> SPACE AREA \\ <br /> I 1p'TYPE A BUFFER+• <br /> II 1 1 (MIXED OPTION, <br /> . rwwwww,) <br /> r FUTUREINTERNAL <br /> Z o 0 <br /> G) LANDSCAPING(TYP,) <br /> f{�I � <br /> _- DEVELOPMENT riMl <br /> �I -- 1; r -� AREA 1 >- <br /> ZU)j / ._ ` v v v c7 v <br /> o IJlllli ,,,+ <br /> J 1 1 --e � <br /> - - STOWAVATLR <br /> !MANAGEMENT FACILI'Y VY TYPE A BUFFER <br /> nuixcn norr� -- ! � <br /> o Southern property line - Major Transportation Corridor(MTC) Buffer: The applicant is <br /> proposing to develop/install/maintain an enhanced MTC Buffer as follows: <br /> ■ A 100 ft. buffer extending approximately 1,000 linear feet east from the <br /> intersection of Mt. Willing Road consistent with Section 6.6.4 of the UDO; <br /> ■ 40 ft. buffer along approximately 1,220 linear feet of the interstate on/off ramp <br /> in front of the proposed travel center; <br />