Browse
Search
Agenda - 02-02-2021 Virtual Board Meeting; 5-a - Review of Zoning Atlas Amendment NC Highway 57 Speedway Rural Economic Development Area (REDA-CZ-1) – Rougemont Self Storage
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2020's
>
2021
>
Agenda - 02-02-2021 Virtual Business Meeting
>
Agenda - 02-02-2021 Virtual Board Meeting; 5-a - Review of Zoning Atlas Amendment NC Highway 57 Speedway Rural Economic Development Area (REDA-CZ-1) – Rougemont Self Storage
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/28/2021 2:25:41 PM
Creation date
1/28/2021 2:48:56 PM
Metadata
Fields
Template:
BOCC
Date
2/2/2021
Meeting Type
Regular Meeting
Document Type
Agenda
Agenda Item
5-a
Document Relationships
Agenda - 02-02-2021 Virtual Board Meeting
(Message)
Path:
\Board of County Commissioners\BOCC Agendas\2020's\2021\Agenda - 02-02-2021 Virtual Business Meeting
Minutes 02-02-2021 Virtual Business Meeting
(Message)
Path:
\Board of County Commissioners\Minutes - Approved\2020's\2021
ORD-2021-003 Ordinance Amending the Orange County Zoning Atlas
(Message)
Path:
\Board of County Commissioners\Ordinances\Ordinance 2020-2029\2021
OTHER-2021-003 Statement of Consistency
(Message)
Path:
\Board of County Commissioners\Various Documents\2020 - 2029\2021
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
89
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
12 <br /> 2537 E.L YON STATION RD,STE 102 <br /> CSOESIGN & PO BOX361 <br /> ENGINEERING, PLLC CREEDMOOR,NC27522 <br /> CLIENT-FOCUSED• COMPREHENSIVE• COST-EFFECTIVE 919-230-0996 <br /> development is limited. The anticipated overall proposed disturbance is less than 40,000 <br /> sf, and therefore the EA/EIS are not applicable to this site. <br /> The previous development was required to comply with several conditions at the time <br /> of approval, all which have been adhered to and are listed on the plans. It is understood <br /> and acceptable to the applicant that the current proposal also adhere to these same <br /> standards as applicable. <br /> J:\DD-PROJECTS\2018\18-079\CIVIL-18-079\Design\Planning\2020-10-27 Project Narrative REV.docx <br /> 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.