Browse
Search
Agenda - 02-02-2021 Virtual Board Meeting; 8-a - Minutes
OrangeCountyNC
>
BOCC Archives
>
Agendas
>
Agendas
>
2021
>
Agenda - 02-02-2021 Virtual Business Meeting
>
Agenda - 02-02-2021 Virtual Board Meeting; 8-a - Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/28/2021 2:17:27 PM
Creation date
1/28/2021 2:01:16 PM
Metadata
Fields
Template:
BOCC
Date
2/2/2021
Meeting Type
Regular Meeting
Document Type
Agenda
Agenda Item
8-a
Document Relationships
Agenda - 02-02-2021 Virtual Board Meeting
(Attachment)
Path:
\BOCC Archives\Agendas\Agendas\2021\Agenda - 02-02-2021 Virtual Business Meeting
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
89
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
20 <br /> 1 As currently envisioned, the widening of Mt. Willing Road would be addressed through <br /> 2 the typical County/NC DOT roadway improvement process. The applicant has <br /> 3 indicated a willingness to reserve/dedicate necessary right-of-way to accommodate <br /> 4 roadway improvements and abide by the following consistent with the EBM AMP: <br /> WX UN <br /> !1 V <br /> 4 F MWMA ov <br /> 14' 1 }Td'L[W1M t/ 14' tp <br /> wit <br /> 1pQ►p1[RlpMip►MMY <br /> 4 LANE DIVIDED(1T-S"RAISED MEDIAN)WITH CURB&GUTTER, <br /> WIDE OUTSIDE LANES,AND SIDEWALKS <br /> P05TEQSPEED 35-45 MPH <br /> MR .; <br /> 4Gib Y 17' 11' 1T�'�11 1' f' 1O <br /> YK 14 <br /> s �4rt wr <br /> 4 LANE DIVIDED(1T-6"RAISED MEDIAN)WITH CURB GUTTER, <br /> BIKE LANES,AND SIDEWALKS <br /> "IW SPEED 35-f5 MPH <br /> 5 <br /> 6 Driveway access to the Project from Mt. Willing Road will be developed in a future <br /> 7 phase (i.e. will not be part of the initial development of the travel center in Phase 1). <br /> 8 The applicant has proposed a temporary access road from Mt. Willing Road for <br /> 9 emergency vehicle access (i.e., fire, ambulance, Sheriff, etc.). This temporary access <br /> 10 proposal has been approved by the County Fire Marshal. <br /> 11 Staff has concerns vehicles will be unable to access the proposed travel center directly <br /> 12 from Mt. Willing Road until Phase 2, the proposed elimination of Exit 160, and the <br /> 13 individual right-in and right-outs allowing access to the proposed Travel Center off of <br /> 14 the Interstate on/off ramp. <br /> 15 Utilities: The project is proposed to be served by public water (Orange-Alamance Water System) <br /> 16 and sewer (City of Mebane). Orange County is continuing to work with Orange-Alamance and <br /> 17 City of Mebane officials to address any and all necessary improvement(s) to accommodate the <br /> 18 Project. Sewer services shall be provided consistent with the existing inter-local utility agreement <br /> 19 between the County and the City of Mebane. <br />
The URL can be used to link to this page
Your browser does not support the video tag.