Orange County NC Website
50 <br /> PLANNING & INSPECTIONS DEPARTMENT <br /> Craig N. Benedict, AICP, Director <br /> Administration 131 W. Margaret Lane <br /> (919) 245-2575 Suite 201 <br /> (919) 644-3002 (FAX) ORANGE COUNTY P. O. Box 8181 <br /> www.orangecountync.gov NORTH CAROLINA Hillsborough, NC 27278 <br /> dh <br /> MEMORANDUM <br /> TO: Michael Harvey, Planner III, Current Planning Supervisor <br /> COPY TO: File <br /> FROM: Patrick Mallett, Erosion Control and Stormwater Supervisor <br /> DATE: 21 DEC2020 <br /> PROJECT: Rougemont Self Storage Phase III (Case #: MA20-0001) <br /> SUBJECT: Erosion Control and Stormwater Review of REDA-CZ-1 Application <br /> Staff has reviewed the submitted application materials for Phase III of the Rougemont Self <br /> Storage Facility and further referenced below. <br /> Zoning: <br /> Current Zoning: Agricultural Residential (AR) and NC Highway 57 Speedway Area Rural <br /> Economic Development Area Conditional Zoning (REDA-CZ-1) <br /> Proposed Zoning: NC Highway 57 Speedway Area Rural Economic Development Area <br /> Conditional Zoning (REDA-CZ-1) <br /> Site Information: <br /> Property ID Number (PIN)- 0910-23-7159 <br /> Property Size: 19.55 acres (7.37 acres in Phase III area) <br /> Location: NC Highway 57, Bacon Road, Mile Branch Road <br /> Watersheds: Little River Protected / Flat River Protected <br /> Major Plan Elements: <br /> • Access via existing Rougemont Storage Facility (Phases All ) using existing entrance; <br /> • Proposing 3 new in-door storage buildings totaling 11,400 sq. ft. (2 building @ 3,600 <br /> sq. ft. each and 1 building @) 4,200 sq. ft.); <br /> • 50,000 sq. ft. of anticipated new land disturbance; and <br /> • 22,680 sq. ft. of additional impervious area. <br /> As currently proposed, Erosion Control And Stormwater has no objections to the approval of <br /> this rezoning request. Please note, however, that the level of proposed land disturbance will <br /> require additional Erosion Control and Stormwater permits. These permits will need to be <br /> submitted, reviewed and approved prior to any on-site development activity. <br />