Browse
Search
Agenda - 01-19-2021; 6-a - Zoning Atlas Amendment Master Plan Development Conditional Zoning District (MPD-CZ) for Efland Station (formerly Beaver Crossing)
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2020's
>
2021
>
Agenda - 01-19-2021 Virtual Business Meeting
>
Agenda - 01-19-2021; 6-a - Zoning Atlas Amendment Master Plan Development Conditional Zoning District (MPD-CZ) for Efland Station (formerly Beaver Crossing)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/15/2021 9:12:02 AM
Creation date
1/15/2021 9:19:22 AM
Metadata
Fields
Template:
BOCC
Date
1/19/2021
Meeting Type
Business
Document Type
Agenda
Agenda Item
6-a
Document Relationships
Agenda 01-19-2021 Virtual Business Meeting
(Message)
Path:
\Board of County Commissioners\BOCC Agendas\2020's\2021\Agenda - 01-19-2021 Virtual Business Meeting
Minutes 01-19-2021 Virtual Business Meeting
(Message)
Path:
\Board of County Commissioners\Minutes - Approved\2020's\2021
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
49
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
30 <br /> Measurement shall be taken from finished grade at the center point of the <br /> front building fagade. <br /> measure to <br /> rnidw$y poirir <br /> between edge <br /> measure 10 and eaves measure+o <br /> hlghni point / r,'-deck tine <br /> of coping <br /> builder hegghr <br /> Rill road H1P rim? GaNed roo{ Shed food M&Mrd <br /> ronf <br /> measured from finlened <br /> grade ai cwterpoinl of <br /> Irons building raude <br /> NOTE: drawing for illustrative purposes only. Determination of height shall be consistent <br /> with applicable County land use regulations, the various conditions herein, and shall be <br /> determined prior to site plan approval. <br /> c. Height — Water Tower Accessory Structure: Shall not exceed 110 ft. in <br /> height including any/all antenna apparatus erected on same.' <br /> d. Setbacks: The Project shall observe the following setbacks: <br /> Property Line: Freestanding Vehicular Use Areas: Signage: <br /> Building/Structures: <br /> Interstate 85/40 100 ft. including any gas 100 ft. and 40 ft. 10 ft. 3 <br /> right-of-way station canopy or fuel consistent with the <br /> pump. proposed MTC buffer <br /> break denoted on the <br /> approved Master <br /> Concept Plan 2 <br /> US Highway 40 ft. 4 40 ft. 4 10 ft. 5 <br /> 70/Interstate <br /> Connector <br /> Road right-of- <br /> way <br /> 1 The applicant is requesting language be modified to indicate water tower height shall be based on utility service <br /> needs rather than an arbitrary height limit. <br /> z Staff is comfortable with the proposed vehicular use area setback as the condition is written. The applicant is <br /> proposing a managed break in the MTC buffer,consistent with existing allowances. They are, however, proposing <br /> to have landscaping in this area where none would normally be required. Staff is comfortable with the provision. <br /> 3 Staff will be recommending a minimum 25 ft.setback for signage erected adjacent to an Interstate right-of-way. <br /> 4 Staff is recommending 50 ft. <br /> 5 Staff is recommending a minimum 20 ft.setback for signage erected adjacent to the road right-of-way. <br />
The URL can be used to link to this page
Your browser does not support the video tag.