Orange County NC Website
9 <br /> Efland Station Domestic Water Demand Estimate(by Fixture Type) <br /> Fixture or Appliance 1 No.of Fixtures Wastewater Demand(GPM) Wastewater Demand(GPD) ; Average Daily Demand(GPM) Average Daily Demand(GPD) ; Peak Flow(GPM) Peak Flow(GPD) <br /> Standard Efficient Standard Efficient 1 Standard Efficient Standard Efficient Standard Efficient I Standard Efficient <br /> Flush Valve Toilet 79 17.6 14.0 25,300 20,300 1 21.1 16.9 30,360 24,360 52.7 42.1 75,900 60,900 <br /> Tank Toilet 120 0.4 0.3 600 500 0.5 0.4 720 600 1.2 1.0 1,800 1,500 <br /> Urinal i 39 2.0 1.0 3,000 1,500 2.4 1.2 3,600 1,800 6.1 3.0 9,000 4,500 <br /> Kitchen Faucet i 32 4.4 3.0 6,400 4,400 i 5.3 3.6 7,680 5,280 13.2 9.0 19,200 13,200 <br /> Bathroom Faucet i 166 7.6 5.2 11,000 7,500 9.1 6.2 13,200 9,000 22.8 15.6 33,000 22,500 <br /> Shower 120 1.4 1.2 2,100 1,700 i 1.7 1.4 2,520 2,040 4.3 3.5 6,300 5,100 <br /> Bath Tub 120 2.3 1.3 3,400 2,000 i 2.8 1.6 4,080 2,400 7.0 4.0 10,200 6,000 <br /> Dish Washer 24 0.7 0.4 1,000 600 i 0.8 0.5 1,200 720 2.0 1.2 3,000 1,800 <br /> Buc-ee's - 16.0 11.6 23,100 16,700 i 19.3 13.9 27,720 20,040 i 48.1 34.8 1 69,300 50,100 <br /> Total 52.5 38.0i 75,600 1 54,800 1 63.0 1 45.7 1 90,720 1 65,760 1 157.4 1 114.1 I, 226,800 1 164,400 <br /> Percentage Saved 27% <br /> This estimate is preliminary in nature and is intended to be used for high-level planning.All values provided are subject to change during final design. <br /> * Buc-ee's water demand is from water usage data taken from an existing site. <br /> **Sewer Flow for Efland Station to be permitted based on the Standard Flows approved by State 02T Requirements <br /> Efland Station Domestic Water Demand Estimate(by Development Area) <br /> Wastewater Demand(GPM) Wastewater Demand(GPD) Average Daily Demand(GPM) Average Daily Demand(GPD) Peak Flow(GPM) Peak Flow(GPD) <br /> Development Area Na.of Fixtures Standard Efficient Standard Efficient Standard Efficient Standard Efficient Standard Efficient 1 Standard Efficient <br /> 1 - 16.0 11.6 23,100 16,700 19.3 13.9 27,720 20,040 48.1 34.8 69,300 50,100 <br /> 2 208 25.3 18.8 36,500 27,100 30.4 22.6 43,800 32,520 75.9 56.4 109,500 81,300 <br /> 3 6 0.8 0.6 1,200 900 1.0 0.7 1,440 1,080 2.4 1.9 3,600 2,700 <br /> 4 480 9.7 6.6 14,000 9,500 11.6 7.9 16,800 11,400 29.0 19.7 11 42,000 28,500 <br /> 5 6 0.6 0.5 1,000 700 0.8 0.6 1,200 840 1.9 1.4 3,000 2,100 <br /> Total 52.5 38.0 75,600 54,800 63.0 45.7 90,720 65,760 157.4 114.2 226,800 164,400 <br /> Percentage Saved 27% <br /> This estimate is preliminary in nature and is intended to be used for high-level planning.All values provided are subject to change during final design. <br /> * Buc-ee's water demand is from water usage data taken from an existing site. <br /> **Sewer Flow for Efland Station to be permitted based on the Standard Flows approved by State 02T Requirement! <br /> Efland Station Domestic Water Demand Estimate(by Use) <br /> Development Area No.of Fixtures Wastewater Demand(GPM) Wastewater Demand(GPD) i Average Daily Demand(GPM) i Average Daily Demand(GPD) I Peak Flow(GPM) i Peak Flow(GPD) <br /> Standard Efficient Standard Efficient Standard Efficient Standard Efficient Standard Efficient i Standard Efficient <br /> Buc-ee's - 16.0 11.6 23,100 16,700 19.3 13.9 27,720 20,040 48.1 34.8 69,300 50,100 <br /> Restaurants 184 22.4 16.6 32,300 24,000 26.9 19.9 38,760 28,800 67.3 49.8 96,900 72,000 <br /> Retail j 21 j 2.6 2.0 j 3,700 2,900 i 3.1 2.4 j 4,440 3,480 j 7.7 5.9 j 11,100 8,700 <br /> Office 3 0.3 0.2 Soo 400 0.4 0.3 600 480 1.0 0.7 1,500 1,200 <br /> Medical Office Building(MOB) 6 0.8 0.6 1,200 900 1.0 0.7 1,440 1,080 2.4 1.9 3,600 2,700 <br /> Short Term Rental 480 9.7 6.6 14,000 9,500 11.6 7.9 16,800 11,400 29.0 19.7 42,000 28,500 <br /> Office/Service/Manufacturing 6 0.6 0.5 1,000 700 0.8 0.6 1,200 840 1.9 1.4 3,000 2,100 <br /> Total 52.5 38.0 75,600 54,800 63.0 45.7 90,720 1 65,760 1 157.4 54.8 226,800 164,400 <br /> Percentage Saved 27% <br /> This estimate is preliminary in nature and is intended to be used for high-level planning.All values provided are subject to change during final design. <br /> * Buc-ee's water demand is from water usage data taken from an existing site. <br /> **Sewer Flow for Efland Station to be permitted based on the Standard Flows approved by State 02T Requirements <br />