Browse
Search
Agenda - 01-19-2021; 6-a - Zoning Atlas Amendment Master Plan Development Conditional Zoning District (MPD-CZ) for Efland Station (formerly Beaver Crossing)
OrangeCountyNC
>
BOCC Archives
>
Agendas
>
Agendas
>
2021
>
Agenda - 01-19-2021 Virtual Business Meeting
>
Agenda - 01-19-2021; 6-a - Zoning Atlas Amendment Master Plan Development Conditional Zoning District (MPD-CZ) for Efland Station (formerly Beaver Crossing)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/15/2021 9:12:02 AM
Creation date
1/15/2021 9:00:43 AM
Metadata
Fields
Template:
BOCC
Date
1/19/2021
Meeting Type
Business
Document Type
Agenda
Agenda Item
6-a
Document Relationships
Agenda 01-19-2021 Virtual Business Meeting
(Message)
Path:
\BOCC Archives\Agendas\Agendas\2021\Agenda - 01-19-2021 Virtual Business Meeting
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
49
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
28 <br /> 4. Major Transportation Corridor (MTC) Overlay District. <br /> NOTE: Overlay District boundaries/designations are not impacted by this <br /> proposal. <br /> d. The Zoning Atlas for Orange County shall be designated MPD-CZ. <br /> Development shall be in accordance with the approved application packet, <br /> master concept plan, and the conditions detailed herein. <br /> II. SITE PLAN: <br /> a. All site plans proposing development within the Project shall be reviewed <br /> by City of Mebane and OAWS staff as part of existing courtesy review <br /> agreements; <br /> b. All site plans shall provide detail denoting the anticipated daily water and <br /> sewer needs for proposed land use(s). Further, all submitted site plans <br /> shall track cumulative water/sewer allocation for each proposed land use as <br /> part of submittal(s). <br /> A lack of water and/or sewer capacity shall result in the denial of the site <br /> plan; <br /> c. Consistent with existing inter-local utility agreements between Orange <br /> County and the City of Mebane, and the approved Application, the Project <br /> will have a daily sewer utility allotment of approximately 77,000 gallons a <br /> day of sewer service. <br /> Site plans proposing development/land uses exceeding cumulative daily <br /> sewer allotments shall be required to provide documentation from the City <br /> of Mebane indicating there is sewer capacity to serve the proposed <br /> development; <br /> d. Prior to the approval of a site plan allowing development within the Project, <br /> the County will need documentation from OAWS indicating there is <br /> sufficient water capacity to serve the Project. A lack of water capacity for a <br /> proposed use shall result in the denial of the site plan; <br /> e. The Orange County Staff Engineer, OAWS staff, and the City of Mebane <br /> Utility Director shall review and approve location(s) of proposed water and <br /> sewer lines prior to site plan approval and the initiation of land disturbing <br /> activity; <br /> f. The Orange County and City of Fire Marshal(s) shall review and offer <br /> comment on: <br /> i. Road layout and construction methodology, <br /> ii. Location of fire lanes, <br /> iii. Location of fire hydrants, and <br /> iv. Location of the proposed stand-pipe(s). <br /> as part of all site plan review. <br />
The URL can be used to link to this page
Your browser does not support the video tag.