Orange County NC Website
21 <br /> 3) False: Efland Station is a general threat to Hillsborough and Orange-Alamance Water systems <br /> This not only a false assertion, but it is physically impossible for it to happen. The site location is <br /> downstream of the West Fork Eno Reservoir (Hillsborough source) and downstream of all Orange- <br /> Alamance Water System Intake facilities. These facts have been confirmed by the Orange County Planning <br /> Department. <br /> 4) Efland Station Stormwater controls are inadequate <br /> Efland Station will provide stormwater quality systems that will reduce both nitrogen and <br /> phosphorus loads beyond what is required by Orange County strict standards. In the case of phosphorus, <br /> the system will reduce levels to below what is being currently produced as an undeveloped cattle pasture. <br /> These facts have been confirmed by the Orange County Planning Department. <br /> Efland Station will be developed in accordance with the Orange County 2030 Comprehensive Plan <br /> promulgated to protect 20,000 acres of critical watershed basins. Efland Station accounts for 100 acres of <br /> the 2000 acres specifically designated for commercial development defined as a Commercial-Industrial <br /> Transition Activity Node between an Interstate and a railway. <br /> 5) False: Efland Station Stormwater controls use the "Preserved Green Space" thereby rendering them "not <br /> preserved" <br /> TruE Efland Station will create Preserved Green Space as what it is intended to be: 40 acres of pervious <br /> green area including undisturbed wetlands and properly buffered streams, walking paths, managed <br /> landscaping, and detention ponds. No more than 10 acres of the 40 acres will be used as stormwater <br /> quality devices. These facts have been confirmed by the Orange County Planning Department. <br /> 6) Rezoning the property to MPD-CZ is less beneficial to the area than the "by-right" ORM zoned <br /> development <br /> While the benefits of the Efland Station proposed uses can be subjectively reviewed, the hard <br /> number comparison between the two zoning designations clearly shows the benefits of MPD-CZ status: <br /> i. Impervious Cover: 70%for ORM Development; 60% for Efland Station. <br /> ii. Required Open Space: 31 acres for ORM; 41 acres for Efland Station. <br /> iii. Permitted Building Area: 2MM square feet for ORM; 425,000 square feet for Efland Station. <br /> There were also false assertions that ORM zoned developments, such as a million square foot distribution <br /> facility and 500,000 square feet of light manufacturing, would be open to scrutiny and public input before <br /> being approved. That is not the case. The County Commission and public has significantly more input for <br /> MPD-CZ zoning projects. These facts have been confirmed by Orange County Planning Department. <br />