Browse
Search
Agenda - 10-01-2001-5
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2000's
>
2001
>
Agenda - 10-01-2001
>
Agenda - 10-01-2001-5
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/2/2008 3:20:53 AM
Creation date
8/29/2008 10:34:29 AM
Metadata
Fields
Template:
BOCC
Date
10/1/2001
Document Type
Agenda
Agenda Item
5
Document Relationships
Minutes - 20011001
(Linked To)
Path:
\Board of County Commissioners\Minutes - Approved\2000's\2001
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
32
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Orange County <br />Solid Waste Managamen! Department <br />Proposed Scope of Work wtth RR31 <br />MRF Analysis antl InPormedonal Presentations <br />weparoa sepremeerss, xost <br />Task L <br />• Provitle an on-site presentation, tlirected M the SWAB, on materiels recovery fecildies <br />(MRF) that is an update of the presentation RRSI matle previously to the public, elected <br />officials antl staff in Orange County during their work evaluating MRF options for Orange <br />County. <br />This would involve a development of draft of presentation materiels, review of presentation <br />antl protluction of final tlocument, on-sde meeting with SWAB antl debriegng session. <br />Estimaetl cost $2,500, including travel expenses. <br />Task 2. <br />• Provitle uptletetl re-analyses wmparing recycling collecllon methotls from the torten[ <br />source-separated systems for urban curbsitle, rwal curbside, antl multifamily recycling to a <br />completely wmmingletl or two-stream (paper/other recyclables), <br />This would include review of current program cost and pedormance date, development of <br />inputs and assumptions far RRSI analysis motlels, review of assumptions with staff, <br />performance of analyses. review and repoding results Further analyses would be <br />consideretl based on initial results of motlel. <br />Estimated cost not fo exceed: $6.000 <br />Task 3. <br />Provitle atldilionel technical assistance regaNing ownership, operation, impacts antl costs of <br />various MRF sizes antl configuralicns M assist the SWAB in determining a recommended <br />configuration, if any, for such efacility. <br />This would Involve RRSI providing profiles of options tlevelaped in past work, discussion of <br />Moss profiles with staff, iden[Aicatlon of up to three new ownership/operation aranados, <br />analysis, repotl and presenMtion to the SWAB, BOCC antl the public on those scenarios. <br />Requiretl follow-up analysis. <br />Estimated cost not to exceetl: $6,500. <br />
The URL can be used to link to this page
Your browser does not support the video tag.