Orange County NC Website
4 <br /> Staff Comment — DONE. This meeting was held in an on-line format on <br /> September 15, 2020. Notes from this meeting are contained within Attachment 5. <br /> Please note, staff held a follow-up information meeting on October 28, 2020 to <br /> review modifications to the application package (i.e. name change, land use <br /> buffer/access management changes, etc.). <br /> • Second Action — The Planning Board reviews the application at a regular meeting and <br /> makes a recommendation to the BOCC. <br /> Staff Comment. The Planning Board completed its review of the Project at its <br /> November 4, 2020 regular meeting, voting unanimously to recommend approval. <br /> • Third Action — The BOCC receives the Planning Board recommendation and makes a <br /> decision at a previously advertised public hearing. <br /> Staff Comment — If the public hearing is held remotely, there is a 24-hour waiting <br /> period required before a decision can be effective per State legislation regarding <br /> virtual/remote meetings. The purpose of the 24-hour waiting period is to allow for <br /> submission of written comments. <br /> Per Section 2.9.2 (F) (3) of the UDO, mutually agreed upon conditions can be imposed as part <br /> this process only if they address: <br /> 1. The compatibility of the proposed development with surrounding property, <br /> 2. Proposed support facilities (i.e. roadways and access points, parking, pedestrian and <br /> vehicular circulation systems, screening and buffer areas, etc.) and/or <br /> 3. All other matters the County may find appropriate or the petitioner may propose. <br /> If approved, the Zoning Atlas will be amended and the zoning designation of the property shall <br /> be changed to MPD-CZ. Development, including permitted land uses, would be in accordance <br /> with the approved development proposal and conditions imposed as part of the atlas <br /> amendment process. <br /> Development of the Property shall only be permitted through the review and approval of site <br /> plan application(s) in accordance within Section 2.5 of the UDO. This is so staff can verify all <br /> imposed conditions are adhered to and allow for final review by members of the Development <br /> Advisory Committee (DAC) as detailed within Section 1.9 of the UDO. <br /> Proposal: The applicant is proposing to rezone the Property to MPD-CZ district allowing for the <br /> development of Efland Station, formerly known as Beaver Crossing, summarized as follows: <br /> i. Intended to: `... create a mixed-use unified development providing a variety of retail, <br /> service, hotel, dining, light industrial/office flex space uses consistent with the Orange <br /> County 2030 Comprehensive Plan ...'; <br /> ii. Construction of approximately 500,000 sq.ft. of building area supporting various land <br /> uses, specifically: <br /> a. A Travel Center including a 120 pump gas station and approximately 64,000 sq.ft. <br /> of retail; <br /> STAFF COMMENT: The applicant has clarified it will be 60 pumps with 120 <br /> actual fuel nozzles/hoses (i.e. 2 fuel nozzles per pump). <br /> b. 120-room multi-story hotel; <br />