Browse
Search
Agenda - 12-15-2020; 8-h - Construction Bid Award for Office Upfit – Whitted Building
OrangeCountyNC
>
BOCC Archives
>
Agendas
>
Agendas
>
2020
>
Agenda - 12-15-20 Virtual Business Meeting
>
Agenda - 12-15-2020; 8-h - Construction Bid Award for Office Upfit – Whitted Building
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/10/2020 3:26:55 PM
Creation date
12/10/2020 2:59:49 PM
Metadata
Fields
Template:
BOCC
Date
12/15/2020
Meeting Type
Business
Document Type
Agenda
Agenda Item
8-h
Document Relationships
Agenda 12-15-2020 Virtual Business Meeting
(Message)
Path:
\BOCC Archives\Agendas\Agendas\2020\Agenda - 12-15-20 Virtual Business Meeting
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
4 <br /> November 12,2020 <br /> Steven Arndt,MBA,CFM,PEM <br /> Director of Asset Management Services <br /> Orange County Government <br /> 300 W Tryon Street,Rm 240 <br /> Hillsborough,NC 27278 <br /> Re: Orange County Emergency Office Upfit <br /> Whitted Building <br /> HH project number: 19-099 <br /> Dear Steven: <br /> This letter is to recommend that the above referenced project be awarded to: <br /> CT Wilson Construction Co,Inc. <br /> 150 Golden Drive,Ste 200 <br /> Durham,NC 27705 <br /> License#: 2443 <br /> The basis of this award is the compilation of the base bid amount plus accepted alternates. <br /> The base bid amount plus accepted alternates are as follows: <br /> Base Bid $ 241,651.00 <br /> Alternate#1 $ 13,597.00 <br /> Alternate#2 $ 5,837.00 <br /> Alternate#4 $ 22,505.00 <br /> Alternate#5 $ 0.00 <br /> Total $ 283,590.00 <br /> This project is an office upfit of 2,795 SF within the Richard E_Whitted Human Services Building.The <br /> work consists of Level 2 Alterations for new partitions,doors,casework,misc.plumbing and electrical <br /> modifications,RVAC ductwork reconfiguration,structural reinforcing of select areas of the existing <br /> floor,and limited ceiling replacement_ The building is an existing Type III-B construction and fully <br />
The URL can be used to link to this page
Your browser does not support the video tag.