Orange County NC Website
92 <br /> 10/13/2020 Page 3 of 4 <br /> Kelsey Westwood Hall, P.E. MPD for Beaver Crossing — Engineering Comments <br /> that NCDEQ and OAWS design criteria and/or direction are <br /> followed specific to the proposed dead end water line. <br /> vi. Water utility design, permitting, and construction shall conform to <br /> NCDEQ and/or OAWS standards. <br /> c. SEWER: <br /> i. Sewer service will likely be provided by City of Mebane. This <br /> statement shall in no way be interpreted as a final determination by <br /> Orange County or City of Mebane to serve the Project with public <br /> sewer. <br /> ii. City of Mebane staff has informally notified Orange County <br /> Engineering staff that the City of Mebane has available sewer <br /> capacity based on the evaluation of a DRAFT sanitary sewer <br /> capacity summary (average daily demand) of 76,421 gallons per <br /> day (GPD) as provided to Orange County by the applicant on <br /> September 1, 2020. However, the City of Mebane has not yet <br /> formally confirmed with Orange County Engineering staff an ability <br /> to serve the Project with public sewer. Only limited sewer demand <br /> data have been made available to Orange County Engineering staff <br /> to date. <br /> iii. So as to prevent a potentially negative impact to available public <br /> sewer capacity within the regional sewer service area, Orange <br /> County Engineering staff recommends a reassessment of proposed <br /> sewer demands via the incorporation of low-flow water fixtures <br /> and/or lower-flow end users throughout the Project, where feasible. <br /> iv. If updated sewer demands are available, applicant shall provide <br /> them to City of Mebane so that City of Mebane may further <br /> evaluate their available sewer capacity and their desire to serve the <br /> Project with public water. <br /> v. The existing terminal sewer manhole along Mt. Willing Road is <br /> located in front of Orange County PIN 9844965832, slightly south of <br /> where currently shown on the preliminary Water and Sewer Map as <br /> submitted to Orange County. See Attachment 2. <br /> i. Sewer utility design, permitting, and construction shall conform to <br /> NCDEQ and/or City of Mebane standards. <br /> d. STORMWATER MANAGEMENT: <br /> i. Stormwater management design, permitting, and construction shall <br /> conform to Section 6.14 of the Orange County Unified Development <br /> Ordinance (UDO). <br /> e. EROSION & SEDIMENTATION CONTROL <br /> i. Erosion & Sedimentation Control (E&SC) design, permitting, and <br /> construction shall conform to Section 6.15 of the Orange County <br /> Unified Development Ordinance (UDO). <br />