Orange County NC Website
62 <br /> Kimley>>>Horn Page 19 <br /> 3. The map will need to be modified to include the detailed design calculations for the <br /> project indicating that the proposed utility lines are sufficient for expected development <br /> and associated/estimated density for the project. <br /> Response: Anticipated design flows for sanitary sewer and potable water are now <br /> shown on a table on Sheet C4.0 (Water and Sewer Map). <br /> 4. Include a note indicating: 'All onsite utilities shall be underground unless approved by the <br /> Board of County Commissioners'. <br /> Response: The requested note has been added to Sheet C4.0 (Water and Sewer <br /> Map). <br /> 5. Indicate connection points to various utility lines. <br /> Response: Connection points have been called out on Sheet C4.0 (Water and <br /> Sewer Map). <br /> 6. Denote the location of any anticipated/planned utility infrastructure (i.e. pump stations, <br /> etc.). <br /> Response: The location of anticipated infrastructure is provided on the plans. See <br /> Sheet C4.0 for details. <br /> 7. Provide detail on anticipated fire flow for the proposed utility lines with detail on how <br /> same will support the project. As a general reminder, fire flow requirements are <br /> necessary for consideration when sizing water lines. <br /> Response: A note has been added to Sheet C4.0 detailing the anticipated fire flow <br /> and potential improvements required. <br /> 8. Provide detail on the anticipated placement of manholes and elevations same. This will <br /> include the provision of a typical manhole construction detail. <br /> Response: Anticipated manhole locations are shown on the plans, and elevations <br /> for existing structures are shown on sheet C1.0 Existing Conditions. Proposed <br /> structures will tie into existing structures, and the proposed elevations will <br /> primarily be driven by site grading to be determined at the Site Plan level. <br /> 9. Denote anticipated stub out locations. <br /> Response: Anticipated stub out locations are shown on the plan. Refer to Sheet <br /> C4.0 for details. <br /> 10. Additional detail on expected build-out. This information shall be essential in evaluating <br /> the ability of installed infrastructure to meet current and future needs of the project. <br /> Response: A note detailing additional water needs for the full build-out has been <br /> i <br /> added to Sheet C4.0 (Water and Sewer Map). <br /> Engineering Comments: <br /> A. General: <br /> i. Orange County requests that the applicant consider Orange County's proposed recordation of <br /> up to four (4) 30-ft wide public sanitary sewer easements as shown on the attached redlines. <br /> 00 Morris Street, 00 Durham, NC 27701 • .: <br />