61 <br /> Kimley>>>Horn Page 18 <br /> 2. The proposed tree planting requirements appear to be consistent with the provisions of <br /> Section 6.8.6 (F) of the UDO. <br /> Response: Comment noted. <br /> 3. Denote internal landscaping (i.e. parking lot and parking lot perimeter, building, <br /> preservation of existing significant foliage, etc.)on Sheet 6.0 of the Master Concept Plan <br /> set. <br /> Response: Internal landscaping has been noted on Sheet 6.0 Landscape Buffer <br /> Plan of the plan set. <br /> 4. Major Transportation Corridor(MTC) buffers, including requested breaks consistent with <br /> Section 6.6.4 of the UDO. Staff recognizes the proposal calls for a managed MTC buffer, <br /> versus a cleared 'visual break', for the approximately 1,200 linear ft. of Property along <br /> the Interstate exit. This proposed 'managed MTC buffer break' constitutes a design <br /> standard exceeding current UDO requirements. <br /> Response: Comment noted. <br /> vi. The roadway cross-section on Sheet C 5.0 appears acceptable for internal roadway <br /> development. Staff recommends the drawing be updated to show typical landscaping <br /> installation as well. <br /> Sheet C5.0 has been revised to show typical <br /> Response: The cross section on <br /> landscaping installation as requested. <br /> vii. Provide language(Sheet C 2.0) indicating if denoted stormwater control measures(SCMs)are: <br /> 1. For illustrative purposes(i.e. final SCM location shall be determined with the submittal of <br /> a formal stormwater management plan in accordance with the UDO); <br /> Response: A note has been added to Sheet C2.0 to specify that SCMs are <br /> conceptual in nature and the final location and design will be submitted separately. <br /> 2. Are anticipated to serve as master drainage basin areas or for specific'pods.' <br /> Response: A note has been added to Sheet C2.0 to specify that the SCMs are <br /> anticipated to serve as master drainage basin areas and are not exclusively <br /> serving each pod. <br /> viii. Sheet C 4.0: Section 6.7.1 (B) (6) of the UDO requires a map detailing the utility master plan <br /> for the project. While this Sheet provides the majority of required detail(s), the submittal should <br /> be modified as indicated: <br /> 1. Provide notes detailing anticipated/proposed utility lines (i.e. water/sewer) anticipated <br /> within the project. <br /> Response: Additional details are now provided on Sheet 4.0 to identify the <br /> anticipated size of proposed water and sewer mains for the project. <br /> 2. Denote the anticipated location of sidewalks to assist staff ascertain if there will be any <br /> conflicts with utility location. <br /> Response: Sidewalks are shown where locations are known, and utilities have <br /> been routed to avoid conflicts to the greatest extent possible. Refer to Sheet C4.0 <br /> for details. <br /> kimley-horn.com 300 Morris Street, Suite 200, Durham, NC 27701 <br />