Orange County NC Website
60 <br /> Kimley>>>Horn Page 17 <br /> Master Plan Set Comments: <br /> L. Section 6.7.1 (B) (1) of the UDO requires a map of the development site. While the Master Concept <br /> Plan set provides the majority of required detail(s), specifically Sheet(s) C 2.0 and 2.1 the submittal <br /> should be modified as indicated: <br /> i. Label and identify the various 'lines' on the submitted map(s). Staff recommends you use <br /> different colors to help distinguish the information contained on the individual maps. <br /> Response: The different line types have been called out on Sheets C2.0 and C2.1. The <br /> line types have been differentiated in the sheet legends. <br /> ii. Sheet(s) C 2.0 and 2.1 should display the stream/wetland buffer area per Section 6.13 of the <br /> LIDO. <br /> Response: The stream/wetland buffer area is now included as part of Sheets C2.0 and <br /> C2.1 of the Rezoning Plan. <br /> iii. As previously indicated herein, Sheet(s) C 2.0 and 2.1 should display the following information: <br /> 1. Proposed floor area ratio (FAR) for the Project. <br /> 2. Proposed impervious surface area for the Project. <br /> 3. Proposed open space. <br /> 4. Breakdown of landscape/buffer area (i.e. acreage) for the Project. <br /> 5. Proposed setbacks (internal and external). <br /> 6. Anticipated number of parking spaces, loading berths/stalls, etc. <br /> 7. Maximum allowable building height(in g general and per each individual development pod <br /> if there will be a difference). <br /> 8. Anticipated number of parking spaces with access to alternative energy charging stations <br /> (if proposed). <br /> Response: The information referenced above is now included on Sheet C2.0 to the <br /> greatest extent possible. Refer to the Rezoning Plan for details. <br /> iv. The Project will involve the relocation of existing overhead utility lines. Staff will need <br /> documentation indicating the relocated power line/easement(s) have been approved, and if <br /> development is located within the easement said activity has been approved by the utility <br /> provider. <br /> Response: Comment noted. Documentation will be provided as soon as it becomes <br /> available. <br /> v. Sheet C 6.0 and 6.1 serves as the landscape master plan for the project. Staff recommend(s) <br /> the following: <br /> 1. A 75 ft. land use buffer along the northern property line separating the residential land <br /> uses from Development Area(s) 5 and 3. Planting requirements would follow what is <br /> proposed for the Type F buffer option as depicted on Sheet 6.1. <br /> Response: The buffer along the northern property line remains at 40 feet in width <br /> but is planted as an enhanced Type D buffer. This new buffer type includes the <br /> Type D requirements as well as a 6-foot-high fence.We feel that planting this buffer <br /> any more densely will result in failure of the vegetation due to overcrowding. The <br /> enhanced Type D buffer elevation is illustrated as a elevation graphic on Sheet <br /> C6.1 Landscape Buffer Elevations. <br /> 00 Morris Street, 00 Durham, INIC 27701 . .: <br />