Browse
Search
Agenda - 12-15-2020; 5-b - Zoning Atlas Amendment - Master Plan Development Conditional Zoning District (MPD-CZ) for Efland Station (formerly Beaver Crossing)
OrangeCountyNC
>
BOCC Archives
>
Agendas
>
Agendas
>
2020
>
Agenda - 12-15-20 Virtual Business Meeting
>
Agenda - 12-15-2020; 5-b - Zoning Atlas Amendment - Master Plan Development Conditional Zoning District (MPD-CZ) for Efland Station (formerly Beaver Crossing)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/10/2020 3:19:39 PM
Creation date
12/10/2020 2:49:47 PM
Metadata
Fields
Template:
BOCC
Date
12/15/2020
Meeting Type
Business
Document Type
Agenda
Agenda Item
5-b
Document Relationships
Agenda 12-15-2020 Virtual Business Meeting
(Message)
Path:
\BOCC Archives\Agendas\Agendas\2020\Agenda - 12-15-20 Virtual Business Meeting
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
204
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
52 <br /> Kimley>>>Horn Page 9 <br /> Response: A total impervious surface limit of 62% is now proposed for the project, <br /> which is more restrictive than the maximum of 70% permitted under the UDO. Refer to <br /> Section 2-5.A.1 of the Narrative for details. <br /> vi. The Narrative indicates the Project will comply with the provision(s) of Section(s) 6.13 Stream <br /> Buffers and 6.21 Flood Regulations of the LIDO. This includes preserving required buffers <br /> around identified water features(i.e. streams,wetlands, floodplain, etc.)as defined in the UDO. <br /> Response: Comment noted. Additional language has been added to Section 2-5.13.5 of <br /> the Narrative to specify preservation of required buffers around identified water features <br /> where possible and Sheet 3.1 of the Rezoning Plans shows the buffers to be preserved. <br /> vii. The Narrative appears to indicate the Project will comply with the provision(s) of Section(s) <br /> 6.14 Stormwater and 6.15 Erosion Control of the LIDO. Orange County Erosion Control and <br /> Stormwater Management staffs are reviewing the proposed conditions. As a general <br /> observation: If it is your intention to make use of nutrient buy-down tools, the Narrative should <br /> contain language denoting same. <br /> Response: The Narrative has been revised to specify that water quality requirements <br /> will be met on site by SCMs or nutrient buy-down payments. Refer to Section 2-5.13.8.c.ii <br /> of the Narrative for details. <br /> viii. Staff encourages the applicant to use on-site ponds, designed to capture runoff, for irrigation <br /> purposes as detailed on page 22 of the Narrative. <br /> Response: The applicant will attempt to utilize onsite runoff to the greatest extent <br /> practical for irrigation purposes and to provide regional stormwater ponds that will be <br /> available to individual site developers for irrigation purposes. Refer to Section 2-5 of <br /> the Narrative for details. <br /> L. ENVIRONMENTAL FACTORS: The Narrative indicates the project shall abide by the provisions of <br /> Section 6.4 Performance Standards of the LIDO inclusive (i.e. noise, vibration, air pollution, etc.). <br /> Response: Comment noted. Refer to Section 2-5 of the Narrative for details. <br /> M. ARCHITECTURAL DESIGN STANDARDS: The proposed architectural design standards appears <br /> consistent with the provisions of Section 6.5 Architectural Design Standards of the LIDO. <br /> Response: Comment noted. Refer to Section 2-5 of the Narrative for details. <br /> N. SETBACKS: Staff is recommending the following: <br /> i. 100 ft. perimeter structure setback from all external property lines and right-of-way (i.e. Mt. <br /> Willing Road, the Interstate, etc.); <br /> Response: The proposed setbacks are provided within Section 2-5 of the Narrative. <br /> Although a full 100' perimeter structure setback is not proposed,significant buffers are <br /> proposed along all external property lines and right-of-way and planting and screening <br /> requirements along the rear property line have been increased to address concerns <br /> from adjacent property owners. Refer to Sheets C6.0, C6.1, and C6.2 for information on <br /> proposed buffers. <br /> ii. Vehicular use areas (i.e. access drive-aisle, parking, loading berths): <br /> 1. 100 ft. from residentially zoned property (i.e. the property north of the Project); <br /> 2. 50 ft. from all other property lines/external public rights-of-way; <br /> 3. Staff is recommending all internal setbacks be 20 ft. <br />
The URL can be used to link to this page
Your browser does not support the video tag.