Orange County NC Website
52 <br /> Kimley>>>Horn Page 9 <br /> Response: A total impervious surface limit of 62% is now proposed for the project, <br /> which is more restrictive than the maximum of 70% permitted under the UDO. Refer to <br /> Section 2-5.A.1 of the Narrative for details. <br /> vi. The Narrative indicates the Project will comply with the provision(s) of Section(s) 6.13 Stream <br /> Buffers and 6.21 Flood Regulations of the LIDO. This includes preserving required buffers <br /> around identified water features(i.e. streams,wetlands, floodplain, etc.)as defined in the UDO. <br /> Response: Comment noted. Additional language has been added to Section 2-5.13.5 of <br /> the Narrative to specify preservation of required buffers around identified water features <br /> where possible and Sheet 3.1 of the Rezoning Plans shows the buffers to be preserved. <br /> vii. The Narrative appears to indicate the Project will comply with the provision(s) of Section(s) <br /> 6.14 Stormwater and 6.15 Erosion Control of the LIDO. Orange County Erosion Control and <br /> Stormwater Management staffs are reviewing the proposed conditions. As a general <br /> observation: If it is your intention to make use of nutrient buy-down tools, the Narrative should <br /> contain language denoting same. <br /> Response: The Narrative has been revised to specify that water quality requirements <br /> will be met on site by SCMs or nutrient buy-down payments. Refer to Section 2-5.13.8.c.ii <br /> of the Narrative for details. <br /> viii. Staff encourages the applicant to use on-site ponds, designed to capture runoff, for irrigation <br /> purposes as detailed on page 22 of the Narrative. <br /> Response: The applicant will attempt to utilize onsite runoff to the greatest extent <br /> practical for irrigation purposes and to provide regional stormwater ponds that will be <br /> available to individual site developers for irrigation purposes. Refer to Section 2-5 of <br /> the Narrative for details. <br /> L. ENVIRONMENTAL FACTORS: The Narrative indicates the project shall abide by the provisions of <br /> Section 6.4 Performance Standards of the LIDO inclusive (i.e. noise, vibration, air pollution, etc.). <br /> Response: Comment noted. Refer to Section 2-5 of the Narrative for details. <br /> M. ARCHITECTURAL DESIGN STANDARDS: The proposed architectural design standards appears <br /> consistent with the provisions of Section 6.5 Architectural Design Standards of the LIDO. <br /> Response: Comment noted. Refer to Section 2-5 of the Narrative for details. <br /> N. SETBACKS: Staff is recommending the following: <br /> i. 100 ft. perimeter structure setback from all external property lines and right-of-way (i.e. Mt. <br /> Willing Road, the Interstate, etc.); <br /> Response: The proposed setbacks are provided within Section 2-5 of the Narrative. <br /> Although a full 100' perimeter structure setback is not proposed,significant buffers are <br /> proposed along all external property lines and right-of-way and planting and screening <br /> requirements along the rear property line have been increased to address concerns <br /> from adjacent property owners. Refer to Sheets C6.0, C6.1, and C6.2 for information on <br /> proposed buffers. <br /> ii. Vehicular use areas (i.e. access drive-aisle, parking, loading berths): <br /> 1. 100 ft. from residentially zoned property (i.e. the property north of the Project); <br /> 2. 50 ft. from all other property lines/external public rights-of-way; <br /> 3. Staff is recommending all internal setbacks be 20 ft. <br />