Browse
Search
Agenda - 12-15-2020; 5-b - Zoning Atlas Amendment - Master Plan Development Conditional Zoning District (MPD-CZ) for Efland Station (formerly Beaver Crossing)
OrangeCountyNC
>
BOCC Archives
>
Agendas
>
Agendas
>
2020
>
Agenda - 12-15-20 Virtual Business Meeting
>
Agenda - 12-15-2020; 5-b - Zoning Atlas Amendment - Master Plan Development Conditional Zoning District (MPD-CZ) for Efland Station (formerly Beaver Crossing)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/10/2020 3:19:39 PM
Creation date
12/10/2020 2:49:47 PM
Metadata
Fields
Template:
BOCC
Date
12/15/2020
Meeting Type
Business
Document Type
Agenda
Agenda Item
5-b
Document Relationships
Agenda 12-15-2020 Virtual Business Meeting
(Message)
Path:
\BOCC Archives\Agendas\Agendas\2020\Agenda - 12-15-20 Virtual Business Meeting
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
204
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
40 <br /> ll ll Q Q ' L-6,:4, <br /> 4 F YDEWAtR Win <br /> 5A fWAL[ <br /> _10 z• 14' �r tTb'MEDUv tz• tA• z_' 1a <br /> Nx Nv <br /> f00'MN.2G"fO/WAV <br /> 4 LANE DIVIDED (17'-6" RAISED MEDIAN)WITH CURB&GUTTER, <br /> WIDE OUTSIDE LANES,AND SIDEWALKS <br /> P05TED SPEED 35-45 MPH <br /> e-I e <br /> 4 w Nx Wn acE 11 11 U U p� mx ►a <br /> (V= 1ry fAMWK` 2 L5 E 17' tt' 77-CEP.W <br /> NN <br /> T N4 <br /> t1aNN RIGiIEQF WAY _ ___ _ <br /> 4 LANE DIVIDED(17'-6"RAISED MEDIAN)WITH CURB&GUTTER, <br /> BIKE LANES,AND SIDEWALKS <br /> P05TED SPEED 35-45 MPH <br /> G. Mt. Willing at 1-40 EB off ramp should be considered for a signalized <br /> intersection in Phase 2. <br /> H. Stop sign currently at the off ramp; there is a 4-way stop intersection with <br /> W. Ten Road just south of this juncture. Staff will be working with the <br /> applicant to secure the necessary right-of-way dedication to facilitate <br /> these proposals. <br /> I. Staff would like to see an area of the project (either in Phase I or II) be <br /> reserved for connection to the transit systems of the area; this could <br /> include: <br /> i. A bus stop location with signage <br /> ii. A bus shelter with signage <br /> J. A "Future Transit Amenity by others" on a 1.62-acre parcel on the <br /> northeast edge of the project area is listed on the second page of the <br /> Master Concept Plan, but was not indicated in either TIA. <br /> K. Staff is interested in the internal roadway features of the project site <br /> (when both phases are built out) and what accommodations (sidewalks, <br /> side paths, bike lanes, etc.) might be included. <br /> 18 <br />
The URL can be used to link to this page
Your browser does not support the video tag.