Browse
Search
Agenda - 12-15-2020; 5-b - Zoning Atlas Amendment - Master Plan Development Conditional Zoning District (MPD-CZ) for Efland Station (formerly Beaver Crossing)
OrangeCountyNC
>
BOCC Archives
>
Agendas
>
Agendas
>
2020
>
Agenda - 12-15-20 Virtual Business Meeting
>
Agenda - 12-15-2020; 5-b - Zoning Atlas Amendment - Master Plan Development Conditional Zoning District (MPD-CZ) for Efland Station (formerly Beaver Crossing)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/10/2020 3:19:39 PM
Creation date
12/10/2020 2:49:47 PM
Metadata
Fields
Template:
BOCC
Date
12/15/2020
Meeting Type
Business
Document Type
Agenda
Agenda Item
5-b
Document Relationships
Agenda 12-15-2020 Virtual Business Meeting
(Message)
Path:
\BOCC Archives\Agendas\Agendas\2020\Agenda - 12-15-20 Virtual Business Meeting
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
204
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
203 <br /> c. Water systems and water pressure shall comply with all applicable OAWS <br /> utility standards, building, and fire codes based on the proposed land use; <br /> d. Sizing/looping of utility lines shall be based on the proposed development, <br /> including water flow test data and shall be reviewed and approved by <br /> County staff and appropriate utility entity; <br /> e. Fire-flow test(s) of all installed hydrants shall be conducted, in <br /> coordination with OAWS and Orange County Emergency Services, to <br /> ensure compliance with applicable State Fire Code standards. <br /> VIII OTHER: <br /> a. Structures erected within the Project shall be designed to allow for <br /> incorporation of solar infrastructure installation on rooftops or in adjacent <br /> areas. <br /> b. Electric Vehicle Charging Stations: <br /> i. A paved EV charging station area serving no less than ten (10) <br /> vehicles including the required electrical conduit system will be <br /> constructed within Development Area 1, (completion of the <br /> charging station installation would occur at Applicant's sole <br /> discretion) <br /> ii. EV charging stations will be encouraged within other Development <br /> Areas provided that such facilities shall be ancillary to a principal <br /> land use and as a service to patrons or employees <br /> c. Consideration of L.E.E.D certified practices for components of the Project <br /> where feasible <br /> BE IT FURTHER ORDAINED THAT this ordinance be placed in the book of <br /> published ordinances and that this ordinance is effective upon its adoption. <br /> Upon motion of Commissioner , seconded by <br /> Commissioner , the foregoing ordinance was adopted this <br /> day of ) 2021. <br /> I, Greg Wilder, Interim Clerk to the Board of Commissioners for Orange County, <br /> DO HEREBY CERTIFY that the foregoing is a true copy of so much of the proceedings <br /> of said Board at a meeting held on , 2021 as relates in <br /> any way to the adoption of the foregoing and that said proceedings are recorded in the <br /> minutes of the said Board. <br />
The URL can be used to link to this page
Your browser does not support the video tag.