Browse
Search
Agenda - 12-15-2020; 5-b - Zoning Atlas Amendment - Master Plan Development Conditional Zoning District (MPD-CZ) for Efland Station (formerly Beaver Crossing)
OrangeCountyNC
>
BOCC Archives
>
Agendas
>
Agendas
>
2020
>
Agenda - 12-15-20 Virtual Business Meeting
>
Agenda - 12-15-2020; 5-b - Zoning Atlas Amendment - Master Plan Development Conditional Zoning District (MPD-CZ) for Efland Station (formerly Beaver Crossing)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/10/2020 3:19:39 PM
Creation date
12/10/2020 2:49:47 PM
Metadata
Fields
Template:
BOCC
Date
12/15/2020
Meeting Type
Business
Document Type
Agenda
Agenda Item
5-b
Document Relationships
Agenda 12-15-2020 Virtual Business Meeting
(Message)
Path:
\BOCC Archives\Agendas\Agendas\2020\Agenda - 12-15-20 Virtual Business Meeting
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
204
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
117 <br /> Plan denotes our anticipated buffer program being reviewed by County <br /> staff. <br /> Y. What are the specific landscape standards being proposed for this project? <br /> APPLICANT: The landscape standards for the development are outlined <br /> within the narrative submitted as part of the application. Aside from minor <br /> allowances within Tract 1 , Tracts 2 through 6, the plans generally abide by <br /> the requirements outlined in the Orange County Unified Development <br /> Ordinance. Sheets C6.0 and C6.1 of the Rezoning Plan detail the <br /> landscape standards proposed with the development <br /> Z. Is this information available to the public? <br /> COUNTY STAFF: Yes. Information on this zoning atlas amendment is <br /> available on the County website at: <br /> https://www.orangecountync.gov/792/Planning-Inspections. <br /> AA. What is the schedule of review for this project? <br /> COUNTY STAFF: As indicated the review of this project is adhering to the <br /> following schedule: <br /> • October 7, 2020 — Anticipated Planning Board meeting; <br /> • November 5, 2020 — First available date for public hearing by the <br /> BOCC. <br /> Both meetings will be virtual meeting. Link(s) allowing interested parties <br /> to attend the meeting will be included within the various notification letters <br /> sent out by the County and will also be posted to the County website. <br /> In accordance with Session Law 2020-3 Section 4.31(a), pertaining to <br /> remote meetings during declared emergencies, written comments on <br /> items heard at a public hearing are accepted for 24 hours after the public <br /> hearing is closed. The BOCC will be unable to make a decision on public <br /> hearing items until the 24-hour period for the submittal of written <br /> comments has concluded. <br /> BB. What happens if the City of Mebane says the project cannot be served by <br /> their sewer system? <br /> APPLICANT: We are working with the City of Mebane and Orange <br /> Alamance Water System to implement system upgrades to ensure that the <br /> site can be served by water and sewer services as planned. <br /> COUNTY STAFF: <br />
The URL can be used to link to this page
Your browser does not support the video tag.