Browse
Search
Agenda - 12-15-2020; 5-b - Zoning Atlas Amendment - Master Plan Development Conditional Zoning District (MPD-CZ) for Efland Station (formerly Beaver Crossing)
OrangeCountyNC
>
BOCC Archives
>
Agendas
>
Agendas
>
2020
>
Agenda - 12-15-20 Virtual Business Meeting
>
Agenda - 12-15-2020; 5-b - Zoning Atlas Amendment - Master Plan Development Conditional Zoning District (MPD-CZ) for Efland Station (formerly Beaver Crossing)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/10/2020 3:19:39 PM
Creation date
12/10/2020 2:49:47 PM
Metadata
Fields
Template:
BOCC
Date
12/15/2020
Meeting Type
Business
Document Type
Agenda
Agenda Item
5-b
Document Relationships
Agenda 12-15-2020 Virtual Business Meeting
(Message)
Path:
\BOCC Archives\Agendas\Agendas\2020\Agenda - 12-15-20 Virtual Business Meeting
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
204
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
116 <br /> COUNTY STAFF: The on-line meeting format is being conducted <br /> consistent with adopted State rules allowing local governments to process <br /> development proposals/applications. <br /> While staff understands there are concerns over adjacent property owners <br /> being able to participate in the discussion of this project, the County is <br /> following established protocols. <br /> To that end, additional opportunities are available multiple allowing <br /> individuals to participate the pending Planning Board meeting and BOCC <br /> public hearing. This includes provision of a call-in numbers so property <br /> owners with limited/no internet access can participate in the discussion. <br /> T. How many stories are permitted within the 60' height allowance? <br /> APPLICANT: The submittal is being revised to reflect a height of 35' with <br /> an increased setback for every foot above 35' up to 60'. Certain elements <br /> may exceed this height limitation, such as electrical lines, signs, water <br /> towers, telecommunication towers, and utility structures. <br /> COUNTY STAFF: A 60 ft. building height allowance will typically result in <br /> 5 separate floors. <br /> U. Are uses going to generate significant noise? <br /> APPLICANT: We do not anticipate significant noise being generated on <br /> the subject property, especially given the ambient noise from the nearby <br /> highways. Of course, we will abide by the county noise ordinance. <br /> COUNTY STAFF: At this time there is no indication of the noise level that <br /> could be generated by individual land uses. The County does have, and <br /> enforces, noise regulations. Development of, and those uses permitted to <br /> operate within, this project will have to abide by applicable standards. <br /> V. What is the expected construction timeline? <br /> APPLICANT: After full development approvals, construction is likely to <br /> take 12- 18 months, depending on site work requirements. <br /> W. Has the Applicant performed an environmental study? <br /> APPLICANT: Yes, as part of the application process, we completed an <br /> environmental assessment application package that is being reviewed by <br /> Orange County. <br /> X. Are trees included in the landscaped buffer? <br /> APPLICANT: Yes. Orange County requires a vegetative buffer along the <br /> perimeter of the project. Sheets C-6.0 and C-6.1 of the Master Concept <br />
The URL can be used to link to this page
Your browser does not support the video tag.