Browse
Search
Agenda - 12-15-2020; 5-b - Zoning Atlas Amendment - Master Plan Development Conditional Zoning District (MPD-CZ) for Efland Station (formerly Beaver Crossing)
OrangeCountyNC
>
BOCC Archives
>
Agendas
>
Agendas
>
2020
>
Agenda - 12-15-20 Virtual Business Meeting
>
Agenda - 12-15-2020; 5-b - Zoning Atlas Amendment - Master Plan Development Conditional Zoning District (MPD-CZ) for Efland Station (formerly Beaver Crossing)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/10/2020 3:19:39 PM
Creation date
12/10/2020 2:49:47 PM
Metadata
Fields
Template:
BOCC
Date
12/15/2020
Meeting Type
Business
Document Type
Agenda
Agenda Item
5-b
Document Relationships
Agenda 12-15-2020 Virtual Business Meeting
(Message)
Path:
\BOCC Archives\Agendas\Agendas\2020\Agenda - 12-15-20 Virtual Business Meeting
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
204
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
100 <br /> the I-85/US 70 Connector approximately 400' north of the existing Ben Johnston Road <br /> and two right in-right out accesses on what is described in the study as a service road <br /> resulting from the modification of the existing braided interstate interchange via removal <br /> of the existing westbound 160 exit ramp. A full movement access on Mt. Willing Road <br /> directly across from Turner Street is proposed in phase 2. <br /> Interstate Interchange Modifications: <br /> As previously noted, the traffic study includes recommendations for modification of the <br /> existing westbound I-40/85 braided interstate interchange with removal of the existing <br /> westbound exit 160 ramp resulting in conversion of the braided configuration to a one- <br /> way service road providing access to Mt. Willing Road via reassignment of traffic <br /> currently using this exit 160 to the 161 exit ramp and utilizing the resulting service road <br /> to access Mt. Willing Road. Site access to the resulting service road in the form of two <br /> right in-right out driveways is proposed. NCDOT staff is in general agreement with the <br /> conclusion in the above-referenced weaving assessment that the current configuration is <br /> not desirable due to the presence of a high speed conflict point at the existing exit 160 <br /> gore and the relatively short weaving length provided by the existing braided ramps. Staff <br /> also concurs that operational and safety problems will worsen with the increase in traffic <br /> associated with the proposed development and/or future traffic growth. The proposed <br /> modification of the interchange and the proposed break in the controlled access right of <br /> way to accommodate the proposed site accesses will require review and approval by the <br /> NCDOT Right of Way Disposal and Controlled Access Committee as well as the Federal <br /> Highway Administration. The Applicant has not yet made the necessary submittals to <br /> these bodies; therefore, the outcome of this proposal is not determined at this time. The <br /> remaining comments in this letter are based on the presumption that the modification will <br /> proceed as proposed and contingent upon approval. In the event that the request is not <br /> approved, additional traffic operational analysis for alternate scenarios will be needed. <br /> Required Road Improvements: <br /> As a condition of the pending NCDOT Driveway Permit and contingent upon approval of <br /> the interstate interchange modification and controlled access breaks as described above, <br /> the Applicant will be required to construct the following road improvements to mitigate <br /> traffic impacts attributable to site traffic to ensure acceptable operation. <br /> Phase 1 Improvements: <br /> The following improvements shall be constructed with development of phase 1 and prior <br /> to placing the proposed gas station with convenience store into operation. <br /> Intestate Interchanjze Modification: <br /> Subject to FHWA approval, modify the existing interchange as follows: <br /> • Remove existing westbound 160 exit ramp <br /> • Reconfigure to provide for a one-way service road with dual thru lanes extending <br /> from the 1-85/US 70 Connector to the westbound 160 on ramp and proceeding as <br /> a single thru lane to Mt. Willing Road <br />
The URL can be used to link to this page
Your browser does not support the video tag.