Browse
Search
Agenda - 10-01-2003-9e
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2000's
>
2003
>
Agenda - 10-01-2003
>
Agenda - 10-01-2003-9e
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/2/2008 2:53:05 AM
Creation date
8/29/2008 10:34:27 AM
Metadata
Fields
Template:
BOCC
Date
10/1/2003
Document Type
Agenda
Agenda Item
9e
Document Relationships
Minutes - 20031001
(Linked To)
Path:
\Board of County Commissioners\Minutes - Approved\2000's\2003
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
8 <br />development in the Buckhorn EDD, which will in turn help to stabilize and <br />make permanent zoning of the Buckhorn EDD; and <br />7. the County has secured a $900,000 Environmental Protection Agency <br />(EPA) grant for the construction of portions of a wastewater collection <br />system that could provide the core of wastewater utilities for the EDD and <br />could also provide wastewater collection for the Buckhorn Road <br />community and for the proposed middle school site; and <br />8. the County's EPA grant is a matching fund grant which the County will <br />match with proceeds from the 1997 Efland Sewer Bond; and <br />9. the use of the Bond funds as the match for the EPA grant requires that <br />both the bond funded project and the grant funded project be configured <br />such that system design and construction activities be carried out as two <br />sections or phases of a single project and adhere to the rules and <br />requirements of EPA funded utility projects; and <br />10. Orange County and the City of Mebane have previously cooperated to <br />provide municipal utility service to economic development areas to the <br />mutual benefit of both the City and County; and <br />11. County officials and staff have held discussions with City of Mebane <br />officials and staff about the engineering feasibility of, and the City's <br />willingness to allow, the extension of City water distribution and <br />wastewater collection utilities to the Buckhorn Road community and the <br />EDD; and <br />12. City of Mebane and Orange County officials and staff have determined <br />that extending City water distribution and wastewater collection utilities to <br />the Buckhorn Road community and the EDD is feasible and offers <br />significant benefits to the County, the City and the community; and <br />13. the County wishes to ensure that its adopted development standards for <br />the EDD and the integrity of the County Land Use Plan for the area <br />surrounding the Buckhorn Road community and the EDD remain intact <br />regardless of the availability or ownership of water and wastewater <br />utilities, and: <br />14. the County wishes to insure that the integrity of the Efland Community is <br />not compromised and that it remain distinct from the EDD and the <br />Buckhorn Road community; and <br />15. the City of Mebane desires to secure the right of annexation to property to <br />which it provides municipal utility service and needs to control by virtue of <br />ownership the use, operation, maintenance, rate and fee structure, etc., of <br />the utility infrastructure and service it provides; and <br />
The URL can be used to link to this page
Your browser does not support the video tag.