Orange County NC Website
10 <br />ATTACHMENT "A" <br />General Scope of Work for Engineering Design/Planning Consultant <br />• Preparing Environmental Assessment Reports necessary to meet EPA grant <br />requirements <br />• Providing necessary design and easement surveying <br />• Preparing construction documentation for the Efland Bond area sewer extension <br />• Preparing construction documentation for the Buckhorn Road EDD and Community <br />water and sewer extension <br />• Preparing awater/sewer utility master plan for the Buckhorn EDD <br />• Revising the existing (unapproved) sewer master plan for Efland as necessary to <br />conform to the County's Land Use Plans <br />• Preparing technical documentation necessary to seek additional water/sewer <br />construction grants <br />• Preparing technical documentation necessary to support water utility extension <br />assessment process for Buckhorn EDD <br />• Providing necessary project construction administration and oversight; and <br />