Orange County NC Website
Slide15 <br /> . <br /> Brief Overview <br /> Sli <br /> •WASMPBA adopted in December 2001 to establish water and sewer service <br /> boundaries and other relevant parameters <br /> • Five parties: <br /> •Towns of Chapel Hill, Carrboro,and Hillsborough <br /> • Orange County <br /> • OWASA(Orange Water and Sewer Authority) <br /> • In February,a petition was received from two property owners within <br /> Chapel Hill's ETJ (Extraterritorial Jurisdiction)requesting that two lots be <br /> added to"Primary Service Area" <br /> •All five parties to the agreemen#must approve changes such as#his. <br /> •' #3 <br /> -� <br /> Location <br /> •Vicinity Map in Attachment 2 shows <br /> zoomed out location-southeast <br /> Chapel Hill. � <br /> •2 lots pertaining to petition are <br /> undeveloped by have water and <br /> sewer stub outs. <br /> •Staffs recommended that 9 <br /> additional lots (17 total)in the ' <br /> same subdivision also be added to � <br /> Primary Service Area. <br /> Already served by OWASA water and <br /> sewer lines <br /> Slide <br /> Process <br /> Slide #5 <br /> • Initiated by Town of Chapel Hill since tots are within Town's ETJ <br /> • Review Schedule: <br /> • Chapel Hill-October 28(approved) <br /> • Hillsborough-November 9(approved) <br /> • Carrboro-November 10(approved) <br /> • OWASA-November 12(approved) <br /> • Orange County-November 17 <br /> •Town of Chapel Hill's resolution requested that the governing <br /> boards of the Town of Carrboro,the Town of Hillsborough, Orange <br /> County,and OWASA consider approval of the amendment. <br /> Potential Map Interpretation Policy - <br /> Feedback Request <br /> •Staff requests feedback on whether the staffs of the 5 WASMPBA parties <br /> should commence work on a potential policy for resolving minor <br /> discrepancies in the future through G1S analysis and staff interpretation, <br /> rather than through the existing process which requires formal action by <br /> each of the five governing boards. <br /> • If authorized,staffs would work together on language and bring an item <br /> forward for future consideration. <br /> • Parameters expected to include consideration of future land use <br /> categories and existing zoning,serviceability, amount of land affected, <br /> and distance from existing similar WASMPBA designation (Primary <br /> Service Area vs. Long-Term interest Area) <br />