Orange County NC Website
3 <br /> [Departmental Use Only] <br /> TITLE Splex Roof Replacement <br /> FY 2020-2021 <br /> NORTH CAROLINA <br /> CONSTRUCTION AGREEMENT OVER$50,000.00 <br /> ORANGE COUNTY <br /> THIS CONSTRUCTION AGREEMENT (hereinafter called"Agreement"), made as of the 28th day of <br /> December, 2020, by and between BAR Roofing and Maintenance, (hereinafter called the "Contractor"), and <br /> Orange County, a political subdivision of the State of North Carolina, (hereinafter called the "County," <br /> "Orange County," or"Owner"). <br /> WITNESSETH: <br /> That the Contractor and the Owner, for the consideration herein named, agree as follows: <br /> 1. CONTRACT DOCUMENTS; PRIORITY <br /> The Contract Documents consist of this Agreement, the General Conditions which are fully <br /> incorporated in this Agreement, the Request for Proposals, designer approved communications and field <br /> orders, the Proposal, Construction Documents and Drawings and Written Specifications. The Contract <br /> Documents form the Contract. In the event of any inconsistency between or among the Contract Documents <br /> the Contract Documents shall be interpreted in the following order of priority: <br /> a. This Agreement and incorporated General Conditions attached as Exhibit 1. <br /> b. Designer approved and stamped construction documents and drawings and written <br /> specifications. <br /> c. Designer approved communications and field orders. <br /> d. Request for Proposals and addenda thereto. <br /> e. Proposal. <br /> 2. SCOPE OF WORK <br /> The Contractor shall furnish and deliver all of the materials, and perform, and be fully responsible <br /> for all of the Work required by this Agreement within the time period stipulated in a written Notice-to-Proceed <br /> to be executed by the Contractor and Owner and in accordance with the following enumerated documents, <br /> which are made a part hereof as if fully contained herein: <br /> a. Construction Drawings prepared by Atlas Engineering, Inc (Sheet COV, 1.0,2.0, 3.0, 4.0 dated <br /> August 4, 2020, Project Manual Dated, August, 2020, and Addenum 1 dated 10-1-2020, <br /> Addendum 2 dated 10-16-20, and Addendum 3 dated 10-19-2020) <br /> b. Written specifications prepared by the Designer. <br /> c. BAR Roofing and Maintenance proposal dated October 20, 2020 which fully describes the <br /> Revised 07/20 1 <br />