Browse
Search
Agenda - 11-17-20; 8-a - Minutes
OrangeCountyNC
>
BOCC Archives
>
Agendas
>
Agendas
>
2020
>
Agenda - 11-17-20 Virtual Business Meeting
>
Agenda - 11-17-20; 8-a - Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/12/2020 6:22:03 PM
Creation date
11/12/2020 6:14:17 PM
Metadata
Fields
Template:
BOCC
Date
11/17/2020
Meeting Type
Business
Document Type
Agenda
Document Relationships
Agenda 11-17-20 Virtual Business Meeting
(Message)
Path:
\BOCC Archives\Agendas\Agendas\2020\Agenda - 11-17-20 Virtual Business Meeting
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
45
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
34 <br /> 1 ix. Equipment (i.e. HVAC, elevator overrides, etc.) shall be screened utilizing <br /> 2 1 of the following methods: <br /> 3 1. Clad in exterior materials that are non-reflective or illuminated, OR <br /> 4 2. Designed as an architectural feature of the proposed structure, OR <br /> 5 3. Screened through some vegetative buffer or fencing. <br /> 6 x. All buildings constructed within the Project shall be Energy Star certified at <br /> 7 the time of construction (or in the discontinuance of such certification, <br /> 8 substantially in compliance with the former certification requirements) and, <br /> 9 after issuance of a certificate of compliance (CoC), all installed systems <br /> 10 shall receive proper maintenance in the ordinance course of businesses; <br /> 11 xi. Development within the Project shall utilize LED lighting for interior and <br /> 12 exterior lights, or future successor technology, except in areas where use <br /> 13 of same could typically be prohibited (i.e. lab space, etc.); <br /> 14 xii. Development within the Project shall utilize rain reclamation devices <br /> 15 collecting rainwater for irrigation purposes <br /> 16 xiii. Buildings within the Project shall incorporate `cool roof' systems into their <br /> 17 design. The cool roof system is designed to deliver higher solar reflectance <br /> 18 (i.e. the ability to reflect the visible, infrared and ultraviolet wavelengths of <br /> 19 the sun, reducing heat transfer to the building, etc.) and higher thermal <br /> 20 emittance (the ability to radiate absorbed, or non-reflected solar energy) <br /> 21 than standard designed roofing products. <br /> 22 xiv. Motion control activated lighting shall be, where safety and internal <br /> 23 operations permit, used for all internal building lighting to prevent internal <br /> 24 lights being left on indefinitely; <br /> 25 xv. Bio retention basins(i.e. rain gardens)shall be incorporated into the Project <br /> 26 to capture and treat runoff from truck wells within proposed loading docks; <br /> 27 xvi. Low flow toilets and water fixtures shall be used within the Project for all <br /> 28 restroom facilities and where not associated with a manufacturing or <br /> 29 research process. <br /> 30 d. Landscaping/Buffering: In addition to the standards contained in Section 6.8 of <br /> 31 the LIDO, the following specific standards shall apply to the Project: <br /> 32 i. All required landscaping shall be installed and maintained by the developer <br /> 33 or their successor in perpetuity; <br />
The URL can be used to link to this page
Your browser does not support the video tag.