Orange County NC Website
23 <br /> Lake Orange - Dam Rehabilitation <br /> Project Category County Project Status: New Project Type <br /> Functional Service Area: Community Services Proposed Bid Date: TBD New <br /> Department: Planning and Inspections Starting Date: 7/1/2019 Expansion <br /> Project Number: 10074 Completion Date: 6/30/2025 Renovation x <br /> Replacement <br /> Project Description/Justification: <br /> Lake Orange is a Class II (WS-II) public water supply reservoir owned by Orange County. The lake was created <br /> in 1968 via the construction of an earthen dam and concrete spillway across the east fork of the Eno River. The <br /> lake's primary uses are public water supply as designated by North Carolina Department of Environmental <br /> Quality(NCDEQ) and maintenance of minimum (dry weather)flows in the Eno River, as defined within the Eno <br /> River Water Management Plan (a.k.a. the Eno River Capacity Use Agreement). The Lake Orange dam was <br /> classified by NCDEQ as a "High Hazard" dam in August 2011 which means that failure of the dam could result in <br /> severe property damage and/or possible loss of life downstream. <br /> In Fall 2018, NCDEQ and a private engineering firm conducted dam inspections that identified numerous <br /> deficiencies, due to the age of this 52-year old structure. This project would represent a multi-year approach <br /> to repair these deficiencies, by continuing to address high priority needs in FY2020-21. The FY2020-21 <br /> proposal is to repair the existing erosion control barrier and the associated materials testing for a total request <br /> of$150,000. <br /> FINANCIAL SUMMARY <br /> Current Year 1 Year 2 Year 3 Year 4 Year 5 Five Year 6 <br /> Prior Years Fiscal Year Fiscal Year Fiscal Year Fiscal Year Fiscal Year Fiscal Year Year to <br /> Project Budget Funding 2019-20 2020-21 2021-22 2022-23 2023-24 2024-25 Total Year 10 <br /> Appropriation <br /> Professional Services <br /> Engineering Design-Priority Projects 90,000 <br /> Engineering Design-Spillway Channel <br /> 270,000 270,000 <br /> Replacement <br /> Construction/Repairs/Renovations <br /> Erosion Control Barrier Repair 145,000 145,000 <br /> Gate Actuator Replacement 125,000 125,000 <br /> Intake Tower Demucking 5,000 <br /> Intake Tower Painting 120,000 120,000 <br /> Sluice Gate Replacement 145,000 145,000 <br /> Spillway Channel Point Repairs 40,000 40,000 <br /> Spillway Channel Replacement 1,800,000 1,800,000 <br /> Project Management <br /> Materials Testing -Intake Tower <br /> Painting 5,000 5,000 <br /> Materials Testing-Erosion Control <br /> 5,000 5,000 <br /> Barrier <br /> Materials Testing-Spillway Channel <br /> 5,000 5,000 <br /> Point Repairs <br /> Materials Testing-Spillway Channel <br /> 100,000 100,000 <br /> Replacement <br /> Appropriation Total 95,000 150,000 395,000 45,000 270,000 1,900,000 2,760,000 <br /> Revenues/Funding Source <br /> Debt Financing 95,000 150,000 395,000 45,000 270,000 1,900,000 2,760,000 <br /> Revenues/Funding Source Total 95,000 150,000 395,000 45,000 270,000 1,900,000 2,760,000 <br />