23
<br /> Lake Orange - Dam Rehabilitation
<br /> Project Category County Project Status: New Project Type
<br /> Functional Service Area: Community Services Proposed Bid Date: TBD New
<br /> Department: Planning and Inspections Starting Date: 7/1/2019 Expansion
<br /> Project Number: 10074 Completion Date: 6/30/2025 Renovation x
<br /> Replacement
<br /> Project Description/Justification:
<br /> Lake Orange is a Class II (WS-II) public water supply reservoir owned by Orange County. The lake was created
<br /> in 1968 via the construction of an earthen dam and concrete spillway across the east fork of the Eno River. The
<br /> lake's primary uses are public water supply as designated by North Carolina Department of Environmental
<br /> Quality(NCDEQ) and maintenance of minimum (dry weather)flows in the Eno River, as defined within the Eno
<br /> River Water Management Plan (a.k.a. the Eno River Capacity Use Agreement). The Lake Orange dam was
<br /> classified by NCDEQ as a "High Hazard" dam in August 2011 which means that failure of the dam could result in
<br /> severe property damage and/or possible loss of life downstream.
<br /> In Fall 2018, NCDEQ and a private engineering firm conducted dam inspections that identified numerous
<br /> deficiencies, due to the age of this 52-year old structure. This project would represent a multi-year approach
<br /> to repair these deficiencies, by continuing to address high priority needs in FY2020-21. The FY2020-21
<br /> proposal is to repair the existing erosion control barrier and the associated materials testing for a total request
<br /> of$150,000.
<br /> FINANCIAL SUMMARY
<br /> Current Year 1 Year 2 Year 3 Year 4 Year 5 Five Year 6
<br /> Prior Years Fiscal Year Fiscal Year Fiscal Year Fiscal Year Fiscal Year Fiscal Year Year to
<br /> Project Budget Funding 2019-20 2020-21 2021-22 2022-23 2023-24 2024-25 Total Year 10
<br /> Appropriation
<br /> Professional Services
<br /> Engineering Design-Priority Projects 90,000
<br /> Engineering Design-Spillway Channel
<br /> 270,000 270,000
<br /> Replacement
<br /> Construction/Repairs/Renovations
<br /> Erosion Control Barrier Repair 145,000 145,000
<br /> Gate Actuator Replacement 125,000 125,000
<br /> Intake Tower Demucking 5,000
<br /> Intake Tower Painting 120,000 120,000
<br /> Sluice Gate Replacement 145,000 145,000
<br /> Spillway Channel Point Repairs 40,000 40,000
<br /> Spillway Channel Replacement 1,800,000 1,800,000
<br /> Project Management
<br /> Materials Testing -Intake Tower
<br /> Painting 5,000 5,000
<br /> Materials Testing-Erosion Control
<br /> 5,000 5,000
<br /> Barrier
<br /> Materials Testing-Spillway Channel
<br /> 5,000 5,000
<br /> Point Repairs
<br /> Materials Testing-Spillway Channel
<br /> 100,000 100,000
<br /> Replacement
<br /> Appropriation Total 95,000 150,000 395,000 45,000 270,000 1,900,000 2,760,000
<br /> Revenues/Funding Source
<br /> Debt Financing 95,000 150,000 395,000 45,000 270,000 1,900,000 2,760,000
<br /> Revenues/Funding Source Total 95,000 150,000 395,000 45,000 270,000 1,900,000 2,760,000
<br />
|