Browse
Search
Agenda - 10-01-2003-8o
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2000's
>
2003
>
Agenda - 10-01-2003
>
Agenda - 10-01-2003-8o
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/2/2008 2:54:45 AM
Creation date
8/29/2008 10:34:19 AM
Metadata
Fields
Template:
BOCC
Date
10/1/2003
Document Type
Agenda
Agenda Item
8o
Document Relationships
Minutes - 20031001
(Linked To)
Path:
\Board of County Commissioners\Minutes - Approved\2000's\2003
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
2 <br />installation, bat guano eradication and asbestos abatement for example), funds are insufficient <br />to complete the renovation work that was proposed to coincide with the HVAC replacement. <br />The remaining renovation work, which basically includes painting and floor covering <br />replacement for Building A is recommended for completion in conjunction with the HVAC project <br />in order to avoid the repeated and significant disruption of operations in the building at a later <br />date. <br />The Board is requested to approve funding for this work and other expenses as cited under the <br />Financial Impact section; and to authorize the Manager or his designee to award bids and <br />execute the necessary paperwork, thereby allowing the project to continue within the timeframe <br />that allows the occupants to return to the Whiffed Building as scheduled in December 2003. <br />This is the same work that the Board authorized to be awarded during the summer break, <br />however, the purchase orders were not executed pending completion of the structural work and <br />subsequent assessment of the funding sufficiency. <br />FINANCIAL IMPACT: The table below compares currently available revenue for the project <br />with total projected project costs (see attachment #4 for additional detail). Staff estimates that <br />an additional $475,000 will be needed to complete the project. Remaining work includes <br />replacement of attic insulation (related to the bat guano abatement), painting, flooring and <br />door/wall repairs and moving expenses. This renovation work will be completed in phases over <br />the next few months as the HVAC contractors complete their portion of the work and clear the <br />area. Materials to complete the work will be purchased directly by the County through existing <br />State and GSA (federal government) contracts, thereby minimizing the County's overall costs. <br />To the extent needed, labor will be bid for the various components, such as painting, installation <br />of flooring, etc. <br />Available funding for project $3,260,860 <br />Anticipated roject expenditures $3,735,754 <br />itiona un s ee a to omp ete <br />Project <br />$474,894 <br />Last spring, the Board reviewed unfunded capital needs identified by County and school staffs. <br />These were identified as high priority needs that should be addressed in the near future, but for <br />which no specific funding source had been identified. Examples of this category of projects <br />included renovations at the Northern Human Services Center and construction of a new Animal <br />Shelter. Commissioners asked staff to assess how the unfunded projects might fit into the <br />County's plans to seek loans from financial institutions over the next few years. That <br />assessment will be presented to the Board at its October 27, 2003 work session on Capital <br />Investment Plan issues. <br />In the meantime, the estimated $475,000 needed to complete the Whitted Center renovation in <br />a timely way should be added to the list of urgent but unfunded County capital improvements. <br />Staff recommends that the Board indicate its intent to include $475,000 in additional funding for <br />the Whiffed Center project, to be obtained through alternative financing. That authorization will <br />permit staff to encumber and expend the additional funds required to complete flooring, <br />
The URL can be used to link to this page
Your browser does not support the video tag.