Orange County NC Website
11 <br />CO #7: <br />Modifications outlined in RNM field report dated March 2, 2003, RNM supplemental fire alarm drawings <br />#FA1-FAS dated March 14, 2003, and structural repairs outlined in Bilger Engineering sketches dated <br />February 22, 2003 and March 8, 2003. <br />Modifications are required by the County of Orange Buildings Inspections department, for the purpose of <br />improving the egress capability of the facility in the event of a fire, and the structural integrity of the <br />buildings <br />Amount: $90550.00 dated 4/8/03 <br />CO #8: <br />Additional fire alarm system devices as required by the County of Orange Buildings Inspections Dept. for <br />final approval. <br />Concrete slab repair in "B" Building. <br />Amount: $4792.00 dated 6/30/03 <br />CO #9: <br />Environmental Air Systems & Evans Electric has proceeded as directed to bring the existing electrical <br />distribution system into code compliance. Most if not all of this work has been completed. <br />Upgrade the battery pack on the fire alarm panel as opposed to replacing the existing panel as <br />recommended on COR 13, which this proposal replaces. <br />Furnish & install the necessary telephone cable & outlets for Building "A" <br />Amount: $50296.00 dated 6/30/03 <br />CO #10: Structural repairs as outlined in the July 4, 2003 memo from Bilger Engineering, to repair <br />damaged ceiling /roof structure over the Library <br />Amount: $56254.00 dated 7/28/03 <br />CO #1 l: Building A ceiling the glue/adhesive asbestos abatement as outlined in Power Component <br />Systems, Inc July 11, 2003 quotation and Associated Air Rary. <br />Monitoring services as outlined in EI Inc. July 23, 2003 quotation. <br />Amount: $36,659.00 dated 8/7/03 <br />CO #12: <br />Removal of plaster lath from the second floor corridor ceiling, resulting from the ceiling the glue/adhesive <br />removal, as described in Tide-Up Construction Company, Inc August 7, 2003 proposal <br />Amount $3500.00 dated 8/14/03 <br />CO #13: <br />Additional work associated with the drywall & structural changes to Building "A"EAS proceeded with <br />covering the overhead wood structure in the main entrance to the Library with drywall where plaster lath <br />was removed. <br />Amount: $2020.00 dated 9/2/03 <br />Total Amount of Change Orders To Date: $385,686.00 <br />