Browse
Search
Agenda - 10-01-2003-8o
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2000's
>
2003
>
Agenda - 10-01-2003
>
Agenda - 10-01-2003-8o
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/2/2008 2:54:45 AM
Creation date
8/29/2008 10:34:19 AM
Metadata
Fields
Template:
BOCC
Date
10/1/2003
Document Type
Agenda
Agenda Item
8o
Document Relationships
Minutes - 20031001
(Linked To)
Path:
\Board of County Commissioners\Minutes - Approved\2000's\2003
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
10 <br />To: Donna Dean, Budget Director <br />From: Wilbert McAdoo, Public Works Director <br />Date: September 16, 2003 <br />Re: Environmental Air Systems, Inc. (EAS) change orders <br />HVAC Systems Replacement <br />CO #l: <br />Furnish and install an energy management control system as manufactured and installed by Siemens <br />Technology. <br />Amount: $75,000.00 dated 1/6/03 <br />CO #2: <br />Exterior lighting changes on the Recreation Building to provide photocell control of the outdoor lights as <br />outdoor lighting control does not exist in the Recreation Building <br />Amount: $3364.00 dated 1/29/03 <br />CO #3: <br />Install one additional category SE data cable to each location shown on drawings to receive data outlet. <br />All cabling is to be terminated and tested to BICSI standards and results provided on disc. <br />Amount: $20562.00 dated 1/29/03 <br />CO #4: <br />Repair of the drywall ceiling to restore fire separation on level 1 and 2 of the "B" Building, and upgrades <br />of electrical distribution system involving removal of PVC conduit installed in the return air plenum on <br />level 1 of "B" Building. Life safety to comply with Orange County Building Inspections code <br />requirements. <br />Amount: $15240.00 dated 2/3/03 <br />CO #5: <br />Installation of fifty additional data outlets in Building "B" as requested by :Dick Taylor. <br />Installation of a 2" conduit into the telecommunications room in Building "A" as requested by Dick <br />Taylor. <br />$9665.00 dated 2/25/03 <br />CO #6: <br />Modifications for the Dental Lab to conform to the requirements of the Patterson Dental Supply, Inc. <br />drawings 1 & 2 dated 1/24/03 <br />Modifications for the Health Dept requested by Owner as outlined in the Corley Redfoot Zack, Inc Project <br />instructions dated 3/3/2003 and as discussed in job meetings on 3/13/03 and 3/19/03. <br />Amount: $17784.00 <br />
The URL can be used to link to this page
Your browser does not support the video tag.