Browse
Search
Agenda - 11-05-20; 7-a - Interim Alternative Implementation Approach (IAIA) – Upper Neuse River Basin Association (Falls Lake Rules)
OrangeCountyNC
>
BOCC Archives
>
Agendas
>
Agendas
>
2020
>
Agenda - 11-05-20 Virtual Business Meeting
>
Agenda - 11-05-20; 7-a - Interim Alternative Implementation Approach (IAIA) – Upper Neuse River Basin Association (Falls Lake Rules)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/29/2020 2:58:45 PM
Creation date
10/29/2020 2:48:16 PM
Metadata
Fields
Template:
BOCC
Date
11/5/2020
Meeting Type
Business
Document Type
Agenda
Agenda Item
7-a
Document Relationships
Agenda 11-05-20 Virtual Business Meeting
(Message)
Path:
\BOCC Archives\Agendas\Agendas\2020\Agenda - 11-05-20 Virtual Business Meeting
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page | 4 <br /> <br /> Infrastructure improvements including <br />o Repair and replacement of leaky infrastructure <br />o Reduction of sanitary sewer overflows <br />o Extension of sewer lines to areas using onsite systems (targeting areas with <br />known failure issues) or package plants <br /> Illicit discharge detection and elimination <br /> Land conservation in high priority areas (as determined through an appropriate <br />evaluation resource, i.e., land conservation programs that identify water quality aspects <br />of available preservation sites) <br /> Floodplain restoration and reconnection <br /> Greenways and parks with water quality and quantity benefits (as documented through <br />the development plans) <br /> Projects and activities that focus on flooding that have an associated water quality <br />benefit <br /> Operation and maintenance costs associated with preserving long‐term functionality of <br />practices implemented under the IAIA <br />Additional activities/projects beyond those listed above are allowed under the IAIA pending <br />approval by DEQ/DWR. The assessment of additional activities/projects will be based on the <br />general principles and provisions contained in the IAIA which are aimed at meeting the general <br />criteria of water quality improvement or protection in the watershed and the Lake. <br />What are the ways that jurisdictions can demonstrate participation in the IAIA? <br />There are four options for funding projects that would count under the IAIA: <br /> Self‐funded (single jurisdiction) <br /> Interlocal agreement (two or more jurisdictions) <br /> Funding existing local organizations (like County Health Departments, School Districts, <br />Soil and Water Conservation Districts, existing utilities, etc.) <br /> Contributing to a “pool” of funds to be managed by the UNRBA in consultation with the <br />jurisdictions contributing to the pool <br />Regardless of the type of funding arrangement used to demonstrate participation and <br />compliance under the IAIA, participants will be required to report their efforts to DWR, in <br />accordance with IAIA guidelines. <br /> <br />7
The URL can be used to link to this page
Your browser does not support the video tag.