Orange County NC Website
Page | 4  <br />  <br /> Infrastructure improvements including   <br />o Repair and replacement of leaky infrastructure  <br />o Reduction of sanitary sewer overflows  <br />o Extension of sewer lines to areas using onsite systems (targeting areas with  <br />known failure issues) or package plants  <br /> Illicit discharge detection and elimination   <br /> Land conservation in high priority areas (as determined through an appropriate  <br />evaluation resource, i.e., land conservation programs that identify water quality aspects  <br />of available preservation sites)     <br /> Floodplain restoration and reconnection  <br /> Greenways and parks with water quality and quantity benefits (as documented through  <br />the development plans)  <br /> Projects and activities that focus on flooding that have an associated water quality  <br />benefit    <br /> Operation and maintenance costs associated with preserving long‐term functionality of  <br />practices implemented under the IAIA  <br />Additional activities/projects beyond those listed above are allowed under the IAIA pending  <br />approval by DEQ/DWR.  The assessment of additional activities/projects will be based on the  <br />general principles and provisions contained in the IAIA which are aimed at meeting the general  <br />criteria of water quality improvement or protection in the watershed and the Lake.  <br />What are the ways that jurisdictions can demonstrate participation in the IAIA?   <br />There are four options for funding projects that would count under the IAIA:   <br /> Self‐funded (single jurisdiction)  <br /> Interlocal agreement (two or more jurisdictions)  <br /> Funding existing local organizations (like County Health Departments, School Districts,  <br />Soil and Water Conservation Districts, existing utilities, etc.)  <br /> Contributing to a “pool” of funds to be managed by the UNRBA in consultation with the  <br />jurisdictions contributing to the pool  <br />Regardless of the type of funding arrangement used to demonstrate participation and  <br />compliance under the IAIA, participants will be required to report their efforts to DWR, in  <br />accordance with IAIA guidelines.  <br />  <br />7