Browse
Search
Planning Board - 110420 Agenda Packet
OrangeCountyNC
>
Advisory Boards and Commissions - Active
>
Orange County Planning Board
>
Agendas
>
2020
>
Planning Board - 110420 Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/29/2020 10:53:22 AM
Creation date
10/29/2020 10:49:20 AM
Metadata
Fields
Template:
BOCC
Date
11/4/2020
Meeting Type
Regular Meeting
Document Type
Agenda
Document Relationships
110420 Virtual Planning Board Minutes
(Message)
Path:
\Advisory Boards and Commissions - Active\Orange County Planning Board\Minutes\2020
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
188
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
COUNTY STAFF: The on-line meeting format is being conducted <br />consistent with adopted State rules allowing local governments to process <br />development proposals/applications. <br />While staff understands there are concerns over adjacent property owners <br />being able to participate in the discussion of this project, the County is <br />following established protocols. <br />To that end, additional opportunities are available multiple allowing <br />individuals to participate the pending Planning Board meeting and BOCC <br />public hearing. This includes provision of a call-in numbers so property <br />owners with limited/no internet access can participate in the discussion. <br />T. How many stories are permitted within the 60’ height allowance? <br /> <br />APPLICANT: The submittal is being revised to reflect a height of 35’ with <br />an increased setback for every foot above 35’ up to 60’. Certain elements <br />may exceed this height limitation, such as electrical lines, signs, water <br />towers, telecommunication towers, and utility structures. <br /> <br />COUNTY STAFF: A 60 ft. building height allowance will typically result in <br />5 separate floors. <br /> <br />U. Are uses going to generate significant noise? <br /> <br />APPLICANT: We do not anticipate significant noise being generated on <br />the subject property, especially given the ambient noise from the nearby <br />highways. Of course, we will abide by the county noise ordinance. <br /> <br />COUNTY STAFF: At this time there is no indication of the noise level that <br />could be generated by individual land uses. The County does have, and <br />enforces, noise regulations. Development of, and those uses permitted to <br />operate within, this project will have to abide by applicable standards. <br /> <br />V. What is the expected construction timeline? <br /> <br />APPLICANT: After full development approvals, construction is likely to <br />take 12- 18 months, depending on site work requirements. <br /> <br />W. Has the Applicant performed an environmental study? <br /> <br />APPLICANT: Yes, as part of the application process, we completed an <br />environmental assessment application package that is being reviewed by <br />Orange County. <br /> <br />X. Are trees included in the landscaped buffer? <br /> <br />APPLICANT: Yes. Orange County requires a vegetative buffer along the <br />perimeter of the project. Sheets C-6.0 and C-6.1 of the Master Concept <br />84
The URL can be used to link to this page
Your browser does not support the video tag.