Orange County NC Website
<br />ii. Driveway off of US Highway 70/I-85 Connector Road, developed in Phase 1, 500 ft. north <br />of Ben Johnson Road including installation of a new traffic signal (shown below): <br /> <br />iii. Access of off Mt. Willing Road across from Turner Street controlled by a Stop Sign <br />constructed in Phase 2 (shown below): <br /> <br />iv. Elimination of Exit 160 off of I-85/40 (i.e. the Efland/Mt. Willing Exit) in Phase 1. The exit <br />will be combined with existing Exit 161 (US Highway 70/I-85 Connector Road). As staff <br />understands it, signage will be added indicating Exit 161 allows access to ‘Efland’ and ‘Mt <br />Willing Road’. To access Mt. Willing Road, travelers will be required to: <br />Access drive – app. <br />600 ft. east of Mt. <br /> <br />Access drive – app. 600 ft. <br />west of the US Highway 70/I- <br />85 Connector Road <br />New driveway <br />New driveway <br />Interstate 85/40 <br />20