Browse
Search
Planning Board - 110420 Agenda Packet
OrangeCountyNC
>
Advisory Boards and Commissions - Active
>
Orange County Planning Board
>
Agendas
>
2020
>
Planning Board - 110420 Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/29/2020 10:53:22 AM
Creation date
10/29/2020 10:49:20 AM
Metadata
Fields
Template:
BOCC
Date
11/4/2020
Meeting Type
Regular Meeting
Document Type
Agenda
Document Relationships
110420 Virtual Planning Board Minutes
(Message)
Path:
\Advisory Boards and Commissions - Active\Orange County Planning Board\Minutes\2020
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
188
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
a. The applicable provisions of the Orange County Unified Development <br />Ordinance (UDO), <br />b. Any and all applicable Federal, State, and local regulations, and <br />c. The application package as submitted by the Applicant and as approved by <br />the Orange County Board of Commissioners on ___________. <br /> <br />BE IT FURTHER ORDAINED THAT in accordance with Section 2.9.2 (F) of the <br />UDO the approval of this Conditional Zoning applicant is subject to the following <br />mutually agreed to conditions: <br />I. GENERAL: <br />a. Approval of the Project does not constitute an explicit guarantee for utility <br />services (i.e. water and sewer) by either the City of Mebane or Orange- <br />Alamance Water System (OAWS). Provision of services shall be <br />consistent with applicable utility connection policies and/or any existing <br />utility agreements between the City of Mebane, OAW S, and Orange <br />County; <br />b. Approval of the Project does not constitute an explicit guarantee for <br />roadway closures/development as denoted on the Master Concept Plan. <br />Closure of the existing Exit 160, and development of right-in/right-out <br />driveways on the existing Interstate on/off ramp, shall require additional <br />review/hearings as part of NC DOT and Federal Highway Administration <br />(FHWA) processes taking action on the request independent on this <br />approval. <br />If roadway realignment is approved, the Project will move forward <br />consistent with the approved plan. If denied, the applicant will have to <br />address necessary modification(s) at a future date. <br />c. The Project shall be composed of 2 individual properties totaling <br />approximately 104 acres of land area further defined as follows: <br />i. PIN 9854-16-1576: An approximately 92 acre parcel currently <br />zoned: <br />1. Office/Research and Manufacturing (O/RM); <br />2. Upper Eno Protected Watershed Protection Overlay District; <br />3. Efland Interstate Overlay District; and <br />4. Major Transportation Corridor (MTC) Overlay District. <br />ii. PIN 9854-36-3711: An approximately 12 acre parcel currently <br />zoned: <br />1. Office/Research and Manufacturing (O/RM); <br />2. Upper Eno Protected Watershed Protection Overlay District; <br />167
The URL can be used to link to this page
Your browser does not support the video tag.