Browse
Search
Planning Board - 110420 Agenda Packet
OrangeCountyNC
>
Advisory Boards and Commissions - Active
>
Orange County Planning Board
>
Agendas
>
2020
>
Planning Board - 110420 Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/29/2020 10:53:22 AM
Creation date
10/29/2020 10:49:20 AM
Metadata
Fields
Template:
BOCC
Date
11/4/2020
Meeting Type
Regular Meeting
Document Type
Agenda
Document Relationships
110420 Virtual Planning Board Minutes
(Message)
Path:
\Advisory Boards and Commissions - Active\Orange County Planning Board\Minutes\2020
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
188
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br /> Provide a two-lane eastbound approach consisting of the following: <br />o One full combination thru-left turn lane <br />o One exclusive right turn lane with 350’ of full storage and appropriate <br />transition per NCDOT requirements <br /> Extend existing southbound left turn lane to provide for 400’ of full storage with <br />appropriate transition per NCDOT requirements. <br /> Provide coordinated traffic signal at this location. <br /> <br />Mt. Willing Road and Turner Road/Proposed Site Driveway Intersection: <br /> <br /> Provide a two-lane westbound approach consisting of the following: <br />o One full exclusive left turn lane <br />o One exclusive right turn lane with a minimum of 100’ of full storage and <br />appropriate transition per NCDOT requirements <br />o Provide a minimum of 100’ internal protected stem length <br /> Provide dual eastbound ingress lanes to accommodate free-flow right turn <br />movements. <br /> Construct a northbound exclusive free-flow right turn lane with 200’ of full <br />storage and appropriate transition per NCDOT requirements <br /> Construct a southbound exclusive left turn lane with 100’ of full storage and <br />appropriate transition per NCDOT requirements <br /> Monitor intersection for signalization. <br /> <br />Multi-modal and Streetscape Enhancements: <br /> <br />Any locally stipulated multi-modal enhancements including but not limited to sidewalk, <br />bike lanes, bus pull offs, lighting, landscaping etc. on State maintained routes are subject <br />to NCDOT requirements and approval through the encroachment process. <br /> <br />General Requirements: <br /> <br />It is necessary to obtain an approved driveway permit and/or encroachment agreement(s) <br />prior to performing work on the NCDOT right of way. As a condition of the permit, the <br />permitee shall be responsible for design and construction of the above stipulated <br />improvements in accordance with NCDOT requirements. An approved permit will be <br />issued upon receipt of approved roadway and signal construction plans, inspection fee, <br />and any necessary performance and indemnity bonds. <br /> <br />The applicant shall dedicate any additional right of way necessary to accommodate the <br />required road improvements or future improvements as stipulated. <br /> <br />Intersection radii and geometry shall be designed to accommodate turning movements of <br />the largest anticipated vehicle. <br /> <br />All pavement markings shall be long life thermoplastic. Pavement markers shall be <br />installed if they previously existed on the roadway. <br />139
The URL can be used to link to this page
Your browser does not support the video tag.